My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2B, MnDOT I694 TH 51 Improvement Project Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
12-06-10-WS
>
2B, MnDOT I694 TH 51 Improvement Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:12:45 AM
Creation date
1/31/2011 1:10:14 PM
Metadata
Fields
Template:
General
Document
12-06-10 City Council Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12— The City requests MnDOT clearly state that the existing area on TH 51 available for non- <br /> motorizedlpedestrian movements will not be lessened in the future with the proposed <br /> improvements. <br /> Mn/DOT response—The existing bridge structures have less width for non-motorized/pedestrian <br /> movements than the proposed bridge structures. <br /> 13-- The City requests that MnDOT commit to including the design standards laid out in the <br /> Architectural and Aesthetic Design Guidelines for the 1-694 Corridor from the Mississippi River <br /> Crossing in Fridley to the 1-6941nterchange in Oakdale, July 2002. <br /> Mn/DOT response—Mn/DOT commits to using the Architectural and Aesthetic Design Guidelines for the 1-694 Corridor from the Mississippi River Crossing in Fridley to the 1-694 Interchange in <br /> Oakdale, July 2002. This document has been given to the bridge design consultants and is being <br /> used by the Mn/DOT bridge design unit in the development of the bridges for the project. <br /> 14— The City requests that MnDOT affirm the intentions for 2015 reconstruction of County Road E <br /> bridge over TH 51 and consider the possibility of moving this construction up in time to match the <br /> balance of the regional construction (for bid economies of scale and logistics). The City may be <br /> able to advance the funds necessary for this construction given a firm repayment in 2015. <br /> Mn/DOT response— Mn/DOT will continue the development of the CR E bridge project in <br /> partnership with the County and City. The current Mn/DOT scoping document has been shared <br /> with Arden Hills and Ramsey County. This proposed project could move up if a funding source can <br /> be found. <br /> Mn/DOT appreciates Arden Hills' continued involvement with this project. Please let me know if <br /> you have any questions. I am available at 651-234-7722. <br /> Sincerely, <br /> ark J. LindeWerga <br /> North Area Engineer <br /> Minnesota Department of Transportation <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.