Laserfiche WebLink
SubTotal <br />Contractor Fees {General Conditions,4verhead,Profit� <br />ArchitecturaE Fees <br />I00% <br />15.00% <br />0.00% <br />$122.10 $18,119,640 <br />$18.32 $2,7i7,946 <br />$O.OU $� <br />� ���, � �i � <br />Total Building Cast $140.42 $20,$37,586 <br />