My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Presbyterian Homes TIF
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
12-20-10- S
>
8A, Presbyterian Homes TIF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:27:41 AM
Creation date
2/2/2011 10:53:19 AM
Metadata
Fields
Template:
General
Document
12-20-10 Special City Counicl Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• If the Developer's costs for environmental remediation exceed $50,000 over and above grar�t <br />proceeds, th� Developer will notify the City. The Ciiy fhen has two options: <br />o Reqttire �ie Developer to cleax and seed the paroperty and provzde the City with either <br />an open space covenant or a restrictive easement {to be determined by the City}; or <br />o Notify the Developer that the City u��l proceed to closing and accept responsibility <br />for any re�naining er�vironmental mitigation beyond the $50,040 obligation of the <br />Developer. <br />Section 4.5. Construction af Utility Improvements and County Road Improvements. Because <br />the City o� Roseviiie may want to assess their portion af the izx�provennents to County Road D, it <br />will need to be a publicly bid project. The Developer ancllor its contractor rnay choose to bid on <br />the project on the same basis as other bidders. The Developer may also choose to pay 100% of <br />project costs (including Roseville's portion) and construci the road improvernenis iiself. The <br />Develaper is required to corr�plete the project no later than December 31, 2016. <br />Section 7.1. Develaper Financing. The conduit debt issuance fee will be calculated as 1% of the <br />first $5 million in bonds, 0.5% of the next $I S million ($5-$20 million), and 0.25% of any bond <br />amount above $20 million. If Presbyterian Homes issues $38 million in bonds, this will result in <br />a total fee of $170,000. The fee will be calculated on an aggregate basis. For example, if <br />consecutive bonds of $15, $12, and $I 1 rnillion are issued, the fees will be $100,000, $42,540, <br />az�:d $27,500 for a total fee of $170,000. In all ather respects, cand�it debt fees wzll be consistent <br />with the City's exisiing Private Activity Bond Policies. <br />LHB Report <br />The City hired LHB, Inc. to prepare a Report of Inspection Procedures and Results for <br />Determining the Qualifications of a Tax Increment Financing District as a Renewal and <br />Renovation Distt�ict as required by State Statutes. Tl�e report has been revised to clarify ihai <br />although the Sutton Place buildin.g is zaot structuxally sub-standard, the building requires <br />substantial renovation or clearan.ce because it is obsolete and nat suita.ble for canversion. The <br />revised report will replace the report provided as Appendix F in t�e Tax Incre�nent Plan far <br />Disirict No. 4 provided in the December 13, 2010 agenda packet. A minor change has also been <br />made #o Appendix G in the Tax Tncrement Plan. Nothing else in the TIF Plan has changed since <br />fhe December 13, 2010 agenda. <br />Reco�nmendation <br />Staff recommends that the City Council approve ihe Contract for Private Developxzaenfi. <br />Attachmen�s <br />A: Black-lined copy of Contract far Private Development showing changes since Dec. 13, 2010 <br />B: C�ean capy of Contract for Private Developmen� <br />C: Revised Appendices F& G to the Ta�c Increment Finance Plan for District No. 4 <br />D: Resolution 2010-OS 1 <br />E: Resplution 2010-0$2 <br />F: Resolution 2010-083 <br />City of Arden Hills <br />City Counczl Work 5ession December 20, 2010 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.