My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2C, Parks Maintenance Management Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-17-10-WS
>
2C, Parks Maintenance Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:05:53 AM
Creation date
2/2/2011 11:47:36 AM
Metadata
Fields
Template:
General
Document
05-17-10 City Counicl Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. GARBAGE & LITTER. Garbage and litter is picked up three times a week, subject to <br /> variability based on weather and scheduled uses. Containers to be washed every two <br /> weeks. <br /> 5. PRUNING. Usually done at least once per season unless species planted dictates more <br /> frequent attention. Sculptured hedges or high growth species may dictate more frequent <br /> attention. <br /> 6. LIGHTING. Replacement or repair of fixtures when observed or reported as not <br /> working. <br /> 7. SURFACES. Should be cleaned,repaired, repainted, or replaced when appearance has <br /> noticeably deteriorated. Graffiti should be washed off or painted over by the next <br /> working day, if possible. <br /> S. REPAIRS. Should be done whenever safety, function, or bad appearance is in question. <br /> 9. INSPECTIONS. Inspections should be done weekly by staff with proper forms filled <br /> out. <br /> 10. FLORAL PLANTINGS. Flowers and shrubs weeded a minimum of once a month or <br /> more as needed. The desired outcome is weed-free. Fertilize as-needed. <br /> 11. RESTROOMS. If portable restrooms are provided, regular servicing to be done usually <br /> by an outside contractor. However, if any servicing is noted, it should become a priority of staff. <br /> 12. PARK AMENITIES. Should be maintained for safety, function, and high quality <br /> appearance as per established design. <br /> 13. PLAY STRUCTURES. Playground areas are monitored daily and inspected monthly. - <br /> High priority to fix or remove hazards due to high use by small children. <br /> LEVEL III <br /> This level of maintenance is performed at mini parks or park green spaces that have typically low <br /> activity(few park amenities). Maintenance at this level is at a moderately low level usually <br /> associated with low visitation or remote parks. Parks categorized in this level: <br /> JOHANNA MARSH, LINDEY'S <br /> 1. TURF CARE. Mowing and trimming to take place every seven to ten working days. <br /> Normally not aerated unless turf quality indicates a need. Topdressing, seeding, and <br /> sodding done only when major bare spots appear. <br /> 2. FERTILIZER. Fertilize only as needed. Weed control normally occurs when weeds <br /> infest turf to a high degree. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.