|
Please note the traffic volumes do not balance between the study
<br />intersections because there are driveways and ancillary intersections
<br />between them.
<br />The historic daily traffic volumes for the area roadways are shown in
<br />Table 3.1. This data was furnished by Mn/DOT.
<br />Table 3.1 – Average Annual Daily Traffic Volumes
<br />30,000
<br />25,000
<br />20,000
<br />CR E E of Lexington
<br />CR E W of Lexington
<br />15,000
<br />Lexington N of CR E
<br />Lexington S of CR E
<br />10,000
<br />5,000
<br />0
<br />1986198819901994199619982000200320052007
<br />Year
<br />6,9006,4006,7007,0007,9009,10010,10010,5009,4009,100
<br />CR E E of Lexington
<br />16,00015,30015,70015,50015,80015,80016,30016,00016,00014,700
<br />CR E W of Lexington
<br />15,70014,50017,50017,00020,00019,00024,00023,00022,40022,400
<br />Lexington N of CR E
<br />13,50011,50012,50012,50012,00012,00014,00013,00011,80013,100
<br />Lexington S of CR E
<br />Guiding Plan for the B2 District 7 Arden Hills, MN
<br />Traffic Impact Study December 2008
<br />
<br />
|