My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1F, Walgreens Concept Review and Transportation Discussion
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
01-20-09-WS
>
1F, Walgreens Concept Review and Transportation Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 10:07:10 AM
Creation date
2/2/2011 4:07:54 PM
Metadata
Fields
Template:
General
Document
01-20-09 City Council Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PTHETRAFFIC STUDY COMPANY Figure 5.1 <br /> Recommended Long Range Improvements <br /> Guiding Plan for the B2 District <br /> Arden Hills, MN <br /> I <br /> 3 <br /> BfKE DRNE LANC?SCAPE �.tEDtAN ANp - .. .. •;. <br /> SIGEWAi,J� EtOULEVARD DRTVE LEFT- TURN UNE U "tt L2R€VE fai;E <br /> 11I mot( BOULEVARD SIDEWALK <br /> , � <br /> 72' <br /> +u' <br /> 1,.--..___._.,....._....�... 88' ROw__-- <br /> t <br /> Reconstruct County Road E from Hamline Avenue to Lexington Avenue to <br /> provide a landscaped median, bike lanes, boulevards, and sidewalks. <br /> r <br /> .f r <br /> a <br /> - Align Holiday Inn Site driveway and Arden Plaza driveway midway <br /> between Pine Tree Drive and Lexington Avenue. <br /> - Control newly formed intersection with a traffic signal. <br /> - Provide left turn lanes on the north and south approaches to the <br /> intersection. <br /> - Promote connecticity throughout parcels to utilize the signalized <br /> intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.