My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A Motion to Authorize Staff to Contract with WSB & Associates, Inc. to Complete the Valentine Lake Subwatershed Drainage Study in an Amount Not to Exceed $14,660
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-29-08-R
>
7A Motion to Authorize Staff to Contract with WSB & Associates, Inc. to Complete the Valentine Lake Subwatershed Drainage Study in an Amount Not to Exceed $14,660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:43:21 AM
Creation date
2/9/2011 4:07:53 PM
Metadata
Fields
Template:
General
Document
9/29/2008 Council Regular
General - Type
9/29/2008 Council Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��+ <br />Ws7� <br />� <br />� h.ra,�«,. , �. <br />I)rnirtage Anal��sis' cPc Flnad Reductian <br />Plaiz — Valerxtine Park <br />Aa�gusr ,21, 20d8 <br />Page I of 3 <br />Pzoposa� to Provide a Drainage Analysis and Flood Reduction Plan %r Valen#ine Park <br />�o��c� i�'nd��°s�r��tding <br />Vaientine Park, iacated at the intersection of Lake Valentine Road and �id Highway 10 (see attached �gure}, <br />is a small park cansisting of a parking area a�d a baseball Fie�d and is currentiy prone to floading. Runoff <br />from the adjacent neighborhoods discharges from rhe storm sewer on the west side of the park and is <br />directed to a culvert at the northeast corner which carries it under Old Highway i0 to Laice Valer�tine. It is <br />our undersranding that the City intends to rrtake improvements to Valen�ine Park and t�e adjacent <br />neighborhoo�s in rhe near Future, includir�g potenria� trail improvernents along Snelling Avenue, which are <br />outlined in a separate RFP. For this reason, an analysis of the drafnage system and hydrology in the area is <br />needed to identify potential solutions to t�e fiooding problem. This analysis wi11 be performed using XP- <br />SWMM safeware, data provid�d by the City, and Feld survey data. <br />_ <br />___ <br />.�"c�,j��� .�l�p��c�ach��cQ�e af �ervi��s <br />Our proposed scope of services is based on our understanding ot the project, Iimited in house da�a, and <br />experience with similar projects. The Eollowing are the primary components of the wor�C plan: <br />Praject Managemenr,/Meetings <br />Project management is an important task to each phase �f the project. This task consists of management <br />and adrrfinistration, praject coordination, and co�nmunication with the City of Arden Hills. This task aIso <br />includes atr�ndance at three �nee�ings with City sraff throughout the proj�ct. Proper co�npletion of rhis <br />task will allow for open lines of eommunication and rourine updates on project issues, as weli as iceeping <br />the project on schedule and within b�dget. <br />Optionul Meetir�gs — As needed, three supplementai meetings wiIl be attended to present rl�e �ir�dings of <br />rhe drainage analysis ta the City Co�ncil, the Parks, Trail and Recrea�on Committee, and the public. This <br />wiii involve presenting the analysis r�sults and the recorn�nended solutions �o the probiems. <br />2. Data CaIlection/Model Develo�znent <br />This involves the gathering af information necessary to cornplete a successful analysis. This informarion <br />will include the fo�lowing ite�ns, as well as any additianal informat�on that will be needed �or the <br />eornpletion af the project: <br />• Record drawings and/or fieid surveys provided by the Ciry. <br />• Topographic and storzn sewer invert data obtained frarr� field surveys. This task is anticipated to <br />require a twa-persan survey crew and take approxirnately two days. <br />• Canc�ptual informarion of anticipated park, neighborhood, and trail improvement plans. This witl <br />aid in providing the City with design alternatives that wilt coincide with future plans. <br />An XP-SWMM model will be used extEnsively to analyze the existing storm sewer sqstem and surrounding <br />hydrology. The XP-SWMM mode� develaped as part of this task will include the areas draining directly <br />and indirectly to Valentine Park. This modet will be used Co identify prablem areas, determine th� <br />arnount of runoff that needs to be stored or infil�-a�ed, and evaluate t�e effectiveness af variaus <br />alternatives to solve the flooding problems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.