My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A Motion to Authorize Staff to Contract with WSB & Associates, Inc. to Complete the Valentine Lake Subwatershed Drainage Study in an Amount Not to Exceed $14,660
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-29-08-R
>
7A Motion to Authorize Staff to Contract with WSB & Associates, Inc. to Complete the Valentine Lake Subwatershed Drainage Study in an Amount Not to Exceed $14,660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:43:21 AM
Creation date
2/9/2011 4:07:53 PM
Metadata
Fields
Template:
General
Document
9/29/2008 Council Regular
General - Type
9/29/2008 Council Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��+p <br />WJO <br />�N11��1r, <br />� A.9s«turrs. rR�. <br />Drairaage Analy�sis & Flood Keduction <br />Plari — Valentine Park <br />August 21, 2008 <br />Page 3 of 3 <br />.�`t���.���ing �`�e __.___. --- <br />A summary of costs to eoinplete the above tasks is as follows: <br />Hourly Budget Breakdown: <br />2-Person <br />Graduate Sur�vey <br />Assaciate Engineer Crew <br />($ I z6�hr) ($ 75/hr) ($14o11'ir) cos� <br />1. Project Management 10 6 0 $ T.,796 <br />2. Optiona� Meetings 6 b 0 $ 1,260 <br />3. Data Collection/ModeI Development 4 60 3.6 $ 7,336 <br />4. Analysis of Madei/Potenaal Solutions 4 15 0 $ 1,b76 <br />5. Pre aration of Technical Memo 8 20 0 $ 2,592 <br />Total Proposed Fee $ 14,65� <br />
The URL can be used to link to this page
Your browser does not support the video tag.