Laserfiche WebLink
Page 2 <br />Tank and Related Acce$saries <br />Manufaeturer Base <br />Stepp Manufacturing Co_ II�c. $67,943.17 <br />Engle �abrication LLC $79,541.28 <br />Ruffridge Johnson Equipment Co. $$0,034.75 <br />ABM Equipment and Su Iy Co. $74,1 i 5.74 <br />Truck Chassis <br />Manufacturer Dealer Cost Trade �n Total wl Tax <br />&Trac�e in <br />Ster3ing Boyer Ford $54,337.00 $5,64Q.00 $SI,853.40 <br />�nte��ational Astleforc� T3-ucks $56,719.00 $S,OOO.QO $SS,OSQ.74 <br />Freightl�ne�- I State Tr�ack Center �56,761.01 <br />FINANCIAL �MPLICATIONS <br />The purc�aase of this t�ek is recommended to be fram two differ�nt vendars. <br />Cab and Chassis <br />Sterling — Soyer Ford - $51,853.0� <br />Registration �ees - $ 3.207.31 <br />Total - $55,060.31 <br />Registration fees are an estimate to be pa�d ta the Department oiMotor Vehicles. <br />Water Tank & Related Items <br />Stepp Manufact�aring - $b'7,943.17 <br />Grand Total: �123,003.48 <br />The 240$ CIP budget inc�uc�ed $] 25,OOQ spHt between the water and sewer capital for this <br />purchase. <br />RECOMMENDED COUNCIL ACT�4N <br />Motion to authorize staff ta purel�ase a new cab and cnassis firo�a Boyer Ford at a cost of <br />$55,060.3 l to i��clude tax, trade in, and registration; and ta aiso authorize sta#`f to purchase the <br />tank and related accessoi�es from Stepp ManUfactuz�ng at a cost af $67,943.48; far a total cost of <br />$123,003.48. <br />