My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A Funding for Design Work on Option for Addressing Traffic Movement Issues
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
3-24-09- WS
>
1A Funding for Design Work on Option for Addressing Traffic Movement Issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2011 12:26:03 PM
Creation date
2/15/2011 12:26:02 PM
Metadata
Fields
Template:
General
Document
3-24-09 Council Worksession
General - Type
3-24-09 Council Worksession
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />RE:MnlDOT <br />CRHInterchange <br />SEHNo.107488 <br />MarcGoess <br />AreaEngineer <br />..Mn/DOT <br />1500WestCountyRoadB2 <br />Roseville,MN55113 <br />WeareprovidingaworkplanforprovidingMnIDOTpreliminarydesignandtrafficengineeringservices <br />fortheCRinterchange.Whatfollowsisanoveralldescriptionoftheworkwewillbeproviding <br />HII-35W <br />.alongwithacostsummarybasedonhourlymtesforthevarioustasksweunderstandthatSEHwillbe <br />.providing. <br />BackgroundtotheProject <br />Overthepast18monthspreliminarydesigneffortshavebeenunderwayfortheCRHII-35Winterchange <br />inArdenHillsandMoUndsView.Thiswork:pointedoutsevemlcapacityandoperationallimitations <br />withthecurrentconfigumtionofI-35Winthisarea.Recognizingthatthereisnofundingforamajor <br />improvementto1-35W,Mn/DOThasraisedsevemlconcernswiththeshortandlongtennimplicationsof <br />improvingtheHinterchangewithoutaddressingthe1-35Wdeficiencies.Specifically,themodeling <br />....hasshownthatNorthBound1-35Wcurrentlysuffersfromcongestionandthisproblemwillonlyworsen <br />asvolumesincreaseandtheNorthBoUndCRHrampisimproved;whichwillreducetheweaving <br />distancetotheCRIexitramp. <br />OnFriday,February6,2009,MnlDOTmetwiththeCitiesofShoreviewandArdenHillstodiscussthis <br />.issue.AsanoutcomeofthatmeetingMn/DOThasproposedtoinitiateastudyofalternativestoaddress <br />theNorthBO\UldweavingissuebetweenCRHandCRI.Whatfollowsisadescriptionofthescopeand <br />costtoconductthestudy.. <br />Scope <br />Task1-ConceptDevelopment <br />FourconceptplanswillbedevelopedforNorthBoundfreewayaccessbetweenCRHandCR1.These. <br />willinclude: <br />•.Concept1-PreferredAlternativeLayoutwithstandardon-mmpgeometryforCRHandno. <br />changestoCRIinterchange.... <br />•.Concept2-PreferredAlternativeLayoutwithstandardon-rampgeOmetryforHandclose <br />.NorthBoundaccesstoorfromCRIinterchange..... <br />•Concept3-PreferredAlternativeLayoutwithwithAuxiliarylaneaddedbetweenCRHand <br />Highway10.CRIexitrampwouldremainandCRIentranceloopwouldberemoved. <br />..•Concept4-PreferredAlternativeLayoutwithcombinedNorthBoundexitrampforbothCRH <br />andCRI.CRIwouldexitusingaone-wayconnectionfromCRHentranceramp.Auxiliary <br />ShortElliottHendrickson·Inc.,3535Drive.Paul.MN55110-5196 <br />SEHisanequalopportunityemployerwww.sehlnc.coml651.49O.2ooo800.325.2055651.490.2150fax <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.