My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, Guiding Plan for the B2 District - Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
02-22-11-WS
>
2A, Guiding Plan for the B2 District - Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:05:44 AM
Creation date
2/17/2011 4:16:17 PM
Metadata
Fields
Template:
General
Document
2A, Guiding Plan for the B2 District
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land Use and Public Improvements Plan <br /> Traffic and Streetscape Improvements <br /> Various street segments in and near the district should receive differing treatments in <br /> plantings, lighting, furniture and banners, as follows: <br /> County Road E <br /> From the west side of the Minnesota Highway 51 bridge to at least Lexington Avenue, <br /> this road should receive the highest Ievel of streetscape improvements. Elements should <br /> include: <br /> • Boulevard trees spaced at an average of 40 feet. <br /> • A planted median that may include trees, shrubs,tall grasses and annual <br /> flowers. <br /> • Decorative lighting at the automobile scale(on the existing bases, located z <br /> 200 feet apart, contemporary styling);optional extra: decorative lighting <br /> at the pedestrian scale located approximately 50 to 70 feet apart) <br /> • Benches and trash receptacles. <br /> • A pair of new continuous concrete sidewalks(6 feet wide)with <br /> connections to adjacent businesses. <br /> ■ Bollards. <br /> ■ AnnuaI flowers(in beds or raised planters). <br /> Seasonal banners on the light poles. <br /> ■ Striped or colored pedestrian crossings. <br /> ■ Bus waiting shelters. <br /> • A traffic signal system at the future intersection located between - <br /> Pine Tree Drive and Lexington Avenue. <br /> ■ Replacement signals,arms and poles for the existing signal systems at(all <br /> optional):the eastern ramp terminals of Highway 51,Pine Tree Drive and <br /> Lexington Avenue. <br /> • Relocating the electrical boxes to a less visible location or screening <br /> where feasible. <br /> • A pedestrian and bicyclist connection over Highway 51,which may be a <br /> separate bridge, a new bridge, or an addition to the existing bridge. <br /> Figure 10 Streetscape Cross Section <br /> LANE CAPE.T�EC)tAN AND <br /> SIDEWALK <br /> BOULEVARD :BIKE, DRIVE DRIVE TURN LANE :DRIVE aRNE BIKE 136ULEVARD. SIDEWALK <br /> LINE LANE LANE I � LANE LANEUI <br /> ice- 8$' ROW= <br />
The URL can be used to link to this page
Your browser does not support the video tag.