My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Lift Station Rehabilitation
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
03-28-11-R
>
7C, Lift Station Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:32:33 AM
Creation date
3/25/2011 7:48:30 AM
Metadata
Fields
Template:
General
Document
March 28, 2011 Reg. City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EN HILLS <br />Request for Council Action <br />Prepared By: Terry Maurer, Council Meeting Date: March 28, 2011 <br />Public Works Director <br />Lift Station Rehabilitatian <br />Budgeted Az�r�ouni: Actual Amount: Funding Source: <br />$385,000 $28,100 Sanitary Sewer Utiliiy Fund <br />(Engineering & Construction) (Engineering Only) <br />Recomme�dation: <br />Authorize engaging S�th Peterson of Boltan and Menk for the design, bidding, and construction <br />activities associated with rehabilitating Lift Station 13 along with ihe engineering services <br />needed for the diagn�ses ar�d repair of the operational problems at Lift Stations 5 and 8, at a cost <br />not to exc�ed $28,1 Q0. <br />Suqnox�tin� Dacumen#s: <br />1. Memarandum dated March 28, 2011, from Terry Maurer, Public Works Director. <br />2. CIP for Reconstruct of Lift Stations 11 and 13 <br />3. Letter dated March 23, 2011, from Seth Peterson, Principal Engineer, addressed to Terry <br />Maurer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.