Laserfiche WebLink
� <br />EN HILLS <br />Request for Council Action <br />Prepared By: Terry Maurer, Council Meeting Date: March 28, 2011 <br />Public Works Director <br />Lift Station Rehabilitatian <br />Budgeted Az�r�ouni: Actual Amount: Funding Source: <br />$385,000 $28,100 Sanitary Sewer Utiliiy Fund <br />(Engineering & Construction) (Engineering Only) <br />Recomme�dation: <br />Authorize engaging S�th Peterson of Boltan and Menk for the design, bidding, and construction <br />activities associated with rehabilitating Lift Station 13 along with ihe engineering services <br />needed for the diagn�ses ar�d repair of the operational problems at Lift Stations 5 and 8, at a cost <br />not to exc�ed $28,1 Q0. <br />Suqnox�tin� Dacumen#s: <br />1. Memarandum dated March 28, 2011, from Terry Maurer, Public Works Director. <br />2. CIP for Reconstruct of Lift Stations 11 and 13 <br />3. Letter dated March 23, 2011, from Seth Peterson, Principal Engineer, addressed to Terry <br />Maurer. <br />