My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Lift Station Rehabilitation
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
03-28-11-R
>
7C, Lift Station Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:32:33 AM
Creation date
3/25/2011 7:48:30 AM
Metadata
Fields
Template:
General
Document
March 28, 2011 Reg. City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital ImPro�ement P1an <br />City of A,rden Hi.l1s, Minnesota <br />�Pro�ect # 1U-Sew-003 <br />Project Name Reconstruct Lif# Statio�s 11 and 13 <br />2011 th�� 2015 <br />T'yp¢ Improveme�t Department Sanitary 5e�ver [3eparttnent <br />U$e��� ���� ConYact Public Warks Director <br />Category Utility lmprovcments Priority nla <br />Descriptioa 3�ots1 Project Cost: 5385,000 <br />Pro�ect to replace lift stations I 1( i 861 fiighway 96) and i 3(! 123 Karth E.a1ce Drive). `Che average iife expectancy for a f ift staiion is 2� years. <br />New pumps and electricai panels 44�ouid be instatEed. The neSv pumps and panels would be compaEibie with the ather i4 lift stations located <br />thrnu�hout ihe City. <br />gngineeringlDesign already completeci, however, a re�iew shouid be comp[eted to ensure no design modifications are needed. <br />.ift Station # i 1 rr�av be im acted b the t[i f�wa i 4/Count Rd 96 <br />]ustification <br />fhe iift statians are over d0 years old and in need of ceplacement. <br />scheduled for 2Q! i_ <br />Expendit�res 201 E 201Z 24l3 2014 2015 Totai <br />�a,oaa <br />PlanningJpesign 90,000 <br />375,600 <br />ConstructionllViaintenance ��5,6oa <br />aas,00a <br />Total 385,a0o <br />Funding Sources 20i1 2012 2013 20l4 2415 Toial <br />385,0(i0 <br />5ani#ary Sewe� Utility Fund 385,000 <br />Tot�l 385,UOU 385,000 <br />Budget ImpactlOther <br />'ump repair costs should decrease as a result of tl�is project_ <br />Produced Using the Plare-!1 Capiarl Planning Sofiware <br />Wednesduy. Navemher Ifl, 2Q10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.