My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Lift Station Rehabilitation
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
03-28-11-R
>
7C, Lift Station Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:32:33 AM
Creation date
3/25/2011 7:48:30 AM
Metadata
Fields
Template:
General
Document
March 28, 2011 Reg. City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON & M�NK, INC. <br />complete the wark, Balton & Menk will assist the City in obtaining quotes for the work and <br />praviding o�erali rnanagerr�ent of the prroject. Should tlae fix require mare substantial work, we <br />s�ggest that the work be coupled with the rehabilitation of Lift Station 13. Bolton & Menk will <br />pro�ide design services includi�g plan and specification preparation, bidding services and overali <br />constr�ction administration for the repairs required ai Lift Stations 5 and 8. <br />The estirr�ated construction cost range for repairs to Lift Statians S and 8 is estimated at $20,000 <br />to $55,000. <br />Lift Station 13 <br />We received some electronic files farwarded to the City from LTRS for the replacement of this lift <br />station. However, we did nat appear ta receive any i�formation regarding lift station 13 and the <br />data that we did recei�e did not agpear to be in a forrnat that would be useful. Therefore, Bolton <br />& Men3� will corr�plete a tapographic survey of the existing lift sEation site and the survey wi13 <br />map ail vi5ible naturat and improved ground conditions and wi�l also include utiliEy field <br />markings receivec� through a Gopher One CaIL The %nal site drawing will serve as a basis f�r <br />final desig�. We understand t�at soil borings were not condueted as part of the previous plans <br />a�d we recommend completing a soil boring at this site to indicate not only the soil types but <br />also the presence of ground water. This Will be helpful for contractors bidding the project. We <br />have not included any costs for soil bori�tgs in our proposal; however, we will assist the City of <br />Arden Hills with the coordination of the sail boring with your preferred geotechnical consultant. <br />Bolton & Menk will prepare final construction pla�s for the lift station replacement and we will <br />re�se as much of the information and data from the existing p�ans as possible. The drawings will <br />include a lift station and wet well pian, section, and electrical anci control drawings and will <br />conforn� to the City of Arden Hills' lift station standards. A site plan will also be corrtpleted that <br />detaiIs access, finished surface, and landscaping improvements. Technical specifications will be <br />prepared incorporating the City's lift station standards. We can �tilize the City's front-end <br />general eonditions and contracts or we can utilize Bolton & Menk, Inc. slandard specifications. <br />Bolton & Menk will provide construction phase services to the City of Arden Hills. In general, <br />we anticipate these services will include bidding assistance and contractor eva�Uations; <br />attendance at a pre-construction meeting; review and approval of pertinent shop drawings and <br />other contractor submittals; construction staking; preparation an�lar review of pay estimates and <br />any necessary change orders; periodic site observations and reports; project jneetings; and final <br />p:roject approval. Boltan & Menk wiIl maintain comm�nicat�ons with the City of Arden Hi1ls <br />throughout the construction phase of the project and will be readiiy availab3e to assist as <br />required. <br />The estimated constrr�ction cost for the replacement of Lift Station l3 is approximately <br />$200,000. <br />PROP�SE� FEE <br />Bolton & Menk proposes ta corr�ptete the scope of work as described abo�e on an <br />for a cost not to exceed $28,100. Any services req�aested that are beyond the <br />seope of this proposal woul� be completed at the standard hourly rates %r the ,� <br />individuals completing the requested work. � <br />E�ift Statinn lmpro��ments <br />City of Arden Hifls, Mf� Page 2 <br />basis <br />:�>.-:��: =�m;.: <br />._.,...�,... ._ .....�...,........ ..� ���`:��;�:�-�€�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.