My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-06-11-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2011
>
04-06-11-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:15:34 PM
Creation date
4/4/2011 9:44:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Evaluation <br />1. Zoning Regulations <br />This application is unique because the request is regarding the use of a building and site that <br />is already developed. The proposed plat meets all Zoning Code requirements except that the <br />subdivision would violate the coverage requirements outlined for the R -2 district. <br />Chapter 11— Subdivision Ordinance — Meets Requirements <br />The Proposed preliminary plat meets all requirements of the City's subdivision <br />requirements. <br />A. Easements — Section 1130.05 Subd. 5 <br />An 11 -foot wide pedestrian pathway has been incorporated into Lot 2 of the preliminary <br />plat, which would connect the parking lot of the Trinity Lutheran property to Hazelnut <br />Park. This exceeds the 10 -foot width recommendation for pedestrian easements under <br />the Subdivision Ordinance. <br />B. Public Use Dedications — Section 1130.08, Subd. 2 <br />The subdivision of the existing property would exceed the requirement to dedicate public <br />land for recreation or conservation, as Lot 2 would be combined with Hazelnut Park. <br />Section 1320.03 — Allowable Uses — Meets Requirements <br />Trinity of Lake Johanna will continue its conditional use as a house of worship in the R -2 <br />district. <br />Section 1320.06 — District Requirements Chart — PUD Required <br />A. Lot Size, Building Coverage, and Landscaping: <br />Lot 1 of the proposed plat does not comply with the minimum landscaping requirements <br />outlined in Section 1320.06. Lot 1 would have 43.9 percent landscaped coverage when <br />65 percent is required by Code. Lot 2 complies with both coverage requirements. The <br />reduction in landscape lot coverage for Lot 1 is necessary in order to transfer Lot 2 to the <br />City for the purpose of additional parkland and open space to be held in perpetuity. The <br />overall impervious surface on the properties would not increase because of this <br />application. <br />City of Arden Hills <br />Planning Commission Meeting for April 6, 2011 <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.