Laserfiche WebLink
Ordinance 2011 -008 <br />5. Earth Sheltered Housing. Earth sheltered construction, as defined <br />in Minnesota Statutes §216(C).06, Subd. 14, shall be considered a <br />practical difficulty if the property is otherwise in compliance with <br />the Arden Hills Zoning Regulations. <br />6. Non Permitted Use. A variance shall not be granted if it would <br />allow a use, which is not otherwise permitted in the zoning district <br />where the property is located. <br />7. Temporary Double Family. A variance may be granted to allow <br />temporary use of a one family dwelling as a two family dwelling. <br />D. Conditions to Insure Compliance. The City Council may impose <br />conditions in granting a variance. A condition must be directly related to <br />and must bear a rough proportionality to the impact created by the <br />variance. <br />Subd. 5 Site Plan Review. <br />A. Public Hearing. A public hearing is not required but neighboring <br />property owners shall be notified. <br />B. Action to Approve. Three affirmative votes of the City Council are <br />required for approval of a site plan. <br />C. Building Permit. The issuance of a permit for a new building or <br />significant site modification for a permitted or established use within a <br />Multiple Dwelling Zoning District or any business or industrial zoning <br />district shall require site plan approval by the City Council according to <br />the procedure defined in Chapter 1355.04. <br />Subd. 6 Planned Unit Development (PUD). <br />A. Two or Three Stage Process. The PUD application and review <br />procedure involves a Concept Plan (optional), a Master Plan Stage, and a <br />Final Plan Stage. <br />B. Public Hearing. A public hearing is required at the Master Plan Stage. <br />The public hearing may be combined with the public hearing for a zoning <br />district change if a zoning district change is required and for a preliminary <br />plat if a preliminary plat of the PUD property is proposed. <br />C. Action to Approve. Four affirmative votes of the City Council are <br />required for approval of the Master Plan. <br />Page 7 of 13 <br />