My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4F, Indian Oaks Court Pond Shoreline Restoration and Landscapin
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
06-27-11-R
>
4F, Indian Oaks Court Pond Shoreline Restoration and Landscapin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:35:35 AM
Creation date
7/8/2011 8:03:06 AM
Metadata
Fields
Template:
General
Document
June 27, 2011 Reg Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EN HTI,LS <br />MEMORANDUM <br />DATE: June 27, 2011 <br />TO: Honorable Mayor and City Councilmembers <br />Pairick Klaers, City Administ�ator <br />FROM: Kristine Giga, Civil Engineer � <br />SUBJECT: Indian Oaks Court Pond Shoreline Restoration and Landscaping <br />Project — Change Order #1 and Payment #1 <br />Back�round <br />The City of Arden Hills awarded Natural Shore Technolagies, Inc. of Map1e Plain, <br />Minnesota, the Tndian Oalcs Court Pon�. Shoreline Resioration and Landscaping Project <br />on Apri� 25, 2011, for a total contract amount of $14,037.20. <br />Discussion <br />This pay request includes work completed th�rough June 9, 2011. The major'rty a� the <br />�work is co�nplete. Once the pipe repair is completed the contractor will cornplete the <br />rernaining restoration around the pipe apron. <br />FinancialIm lications <br />After rneeting in the field with the contractor, ii was determin.ed that some of the biolog <br />rolls used along the edge of the pond wauld need to be larger in diameter, 16", than the <br />12" diarneter originally called out in the plans. On. the sides of the pond where the slopes <br />are steeper, the 12" biolog would have been cornpletely submerged and not effectzve in <br />prot�cting the upland slopes. There were also some areas that needed additional compost <br />material to level out the uneven terrain. However, the contractor did indicate that there <br />would not be a need for as much erosion control blanlcet as was caZled out in the plans. <br />Change order # 1 includes the addition o� compost and �lie laz�ger 16" biolog roIls, and a <br />reduction in the quantity for the 12" biolog rolls and erosion conirol blanket. The total <br />casi increase over the original contract amount is $2,728.80. However, SO°/Q of this r�vill <br />be reirnbursed through the cost-share wi�th the Ramsey Conservation District; therefore, <br />the additional cost ta th.e City is $1,364.40. <br />City Council Meeting <br />I1Metro-inei.uslardenhillslPA&PWIEngineeringlCouncil Actions120 1 116-27-1 1Memo PondMaintenanceRestoration- <br />Paymentl .doc <br />Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.