My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4J, Award the Indian Oaks Court Storm Sewer Repair to CW Houle, Inc. of Shoreview
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
06-27-11-R
>
4J, Award the Indian Oaks Court Storm Sewer Repair to CW Houle, Inc. of Shoreview
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:35:38 AM
Creation date
7/8/2011 8:12:09 AM
Metadata
Fields
Template:
General
Document
June 27, 2011 Reg Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EN HILLS <br />MEMORANDUM <br />DATE: Jun.e 27, 2011 <br />TO: Honarable Mayor and City Councilmembers <br />Patrick Klaers, Cit� Adrninisfrator <br />FROM: Krzstine Giga, Civil Engineer �� <br />SUBJECT: Awarding Bid for the Yndian Oaks Court Siorm Sewer Re�air <br />Back�round/ Discussion <br />At the November 15, 2010 Co�ncil work session, City staff presented and discussed the Indian <br />Oaks Court storm water pond maintenance project. The City Council directed staff to proceed <br />witY� ihe proposed project. The proposed pond mainfenance is being completed in three phases, <br />each with separate construction coniracts: dredging pond sedimer�ts, shoreline restoratian and <br />landscaping, and replacement of the pond's outlet pipe. The pond excavation was completed by <br />Belair Excavating in February, 2011. The re�toration was completed by Natural Shore <br />Technologies in May and June, 2011. <br />Quotes were soliciied in June from four contractors for the tihird phase of ihe project, the pipe <br />repair on Indian Oaks Court. This work inciudes the rernoval and replacernent of the existing <br />pond autlet, two catch basins, castings, and the connecting pipe. Pavemeni re�naval and street <br />patching is also a pat�f of the quote; the patch will be approximately 10 feet wzde for the full <br />width of the street. Three quotes were received an June 22, 2011. The fol�owing is a list of the <br />quotes recei�red: <br />BIDDER AMOUNT <br />CW Ho�le, Inc. $ 12,982.00 <br />Frattalone Campanies $ 13,740.00 <br />Valley-Rich Co., Inc. $ 13,900.00 <br />Based on past practice, the City Council has awarded the contract to the lowesi responsible <br />bidder. In the case of the �ndian Oaks Court Storm Sewer Repair, the lowest responsible bidder <br />is CW Houle, Inc. of Shoreview, Minnesota. City staff has worked with this contractor in the <br />past, and feel that they are a reputable firm that completes good vvark. <br />City Council Meeting <br />11Metro-inet.uslardenhiIlslPR&PW1EngineeringlCouncil Actions120 1 116-27-1 1Memo_PondPipeRepair-QuoteAward.dac <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.