Laserfiche WebLink
2. Boundary and Topographic Survey dated 5/4/09; <br />3. Tree Preservation Plan dated 5 /4 /og as revised on 5/22/09; <br />4. Preliminary Plat dated 5/4/09 as revised on 5/22/09; <br />5. Circulation Plan dated 5/4/09 as revised on 5/22/09; <br />6. Site Plan dated 5/4/09 as revised on 5/22/09; <br />7. Grading and Erosion Control Plan dated 5/4/09 as revised on 5/22/09; <br />8. Utility Plan dated 5/4/09 as revised on 5/22/09; <br />9. Lighting Plan dated 5/4/09 as revised on 5/22/09; <br />10. Landscape Plain dated 5/4/09 as revised on 5/22/09; <br />11. Pedestrian Details dated 5/4/09 as revised on 5/22/09; <br />12. Driveway Enlargement dated 5/4/09 as revised on 5/22/09; <br />13. Elevation A -30o dated 5/4/09 as revised on 5/22/09; <br />14. First Floor Plan A -1o1 dated 5/4/09 ;. <br />15. Roof Plan and Site Sections A-200 dated 5/4/09; <br />16. Initial Phase Development Plan dated 6/3/09; <br />17. Master Development Plan dated 6/3/09; <br />i8. Materials Board as presented on 7/13/09 identifying to following <br />materials and color pallet: <br />a. Brick Number One: Cloud Ceramics — Sahara White Buff <br />b. Brick Number Two: Carolina Ceramics — Heritage Velour; or Mutual <br />materials - Copper <br />c. Brick Number Three: Cloud Ceramics — Cherokee <br />d. Masonry Number One: Anchor Block — Rock-Face Block; Mojave <br />e. Masonry Number Two: Anchor Block — Rock -Face Block; Chocolate <br />f. Masonry Number Three: Anchor Block — Rock -Face Block; Buckskin <br />