My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3A, 2012 Proposed Preliminary Budget and Tax Levy
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
08-29-11-WS
>
3A, 2012 Proposed Preliminary Budget and Tax Levy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:39:47 AM
Creation date
8/26/2011 10:33:32 AM
Metadata
Fields
Template:
General
Document
City Council Work Session 8-29-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SURFACE WATER MANAGEMENT UTIL�TY <br />Functian: Pu�lic Works <br />Su�ervisor: Public Works SuPerin#e�dent <br />Fund##: 604 <br />Activity#: 49550 <br />Function <br />The Surface Water Management Utility F�nd 'zs a self s�s�aining fund, or enterprise fund <br />of the City. The fii�ction of the Surface Water Maz�agement (SWM) uiility is the <br />callection, ireatment and disposition of storzn water as well as the maintenance of the <br />sta� sewers. The current fe� structure is based upon zoning c�assification and parcel <br />acreage. Collection of t�iese f�es is done �ough the utility billing process. <br />Obiectives <br />l. Coilection, trearinent, and dispasition o�stanm water. <br />2. Maintenance of storm sevcTers. <br />Yssues <br />1. B�dget constraints. <br />2. Increased State and Federal regulations. <br />Measurable Workload Data <br />None developed at this time. <br />Bud�et Ca�uaentary <br />The City conducted a raie study in 2008, with imp�e�entaiion in 2009. Due to new <br />mandates, the City converted to a tiered rate system and is aIso phasing out the Senior <br />Citizen Discount by the year 2011. Acte�al rate increases under the new system were <br />effective .Tanuary 1, 2009. T�e ra�e increase t�or 2012 is 3%. The overalE revenue <br />increase for the fun:d is 3.28% over 2011. <br />The 2012 operating budget is an i�crease o� 3.68% from ihe previous year's budget and a <br />decrease of 4.50% overall with capital outlay. Personal Services increased by 12.39°/a <br />due to saiary alIocation changes as the Public Works Director was rnoved out of <br />Emergency Management and Gove�ent Buiidings into this fund to mare accurately <br />reflect actual salary ar�d beneft costs. Salary step increases were also a contrib�tion <br />factor to the increase. The rema'rnder of the decrease in the operating b�dget is an �ffort <br />ta more accurately reflect expected expenditures. Capital Ouilay costs 'rnclude Storm <br />Pflnd Mainienance, the Surface Water Management Plan update, Valentine Park <br />improvements, County Road 9b izx�provements (County Road 8 to US 10), the Caunty <br />Road E impravements between Highway 51 and Lexington Avenue, and the 2011 PMP — <br />.; <br />
The URL can be used to link to this page
Your browser does not support the video tag.