My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3A, 2012 Proposed Preliminary Budget and Tax Levy
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
08-29-11-WS
>
3A, 2012 Proposed Preliminary Budget and Tax Levy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:39:47 AM
Creation date
8/26/2011 10:33:32 AM
Metadata
Fields
Template:
General
Document
City Council Work Session 8-29-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANITARY SEWER UTILITY <br />Department: Public Works <br />Sa�erv'rsor: Pe�biic Works Superintendent <br />Fund#: 602 <br />Activity#: 49490 <br />Act�vitv Sco�e <br />The Sanitary Sewer Utility Fund is a se�f-sustaircing fund, or enterprise fund of the City. <br />The �aintenance of the sanitary sewer lines and lift stations are the responsibility of t�ie <br />Public Works Department. The maintenar�ce program invalves inspections, flushing and <br />cleaning of sewer lines ar�d routine maintena.nce of ihe lift stations. Wastewater flows <br />into tl�e Metropolitan Council's system to be treated. <br />Ob_jectives <br />1. Monitor infiltration af ground water into the sanitary se�ver system. <br />Issues <br />1. Ground waier inflow arid infiitration problems <br />2. Aging syste�-n <br />Measurable Worklaad Data <br />None developed at this time. <br />Bud�et Commentary <br />The City conducted a rate study in 2008, with impiementation in 2009. Due to new <br />tr�andates, the City converted to a�iered rate systern and is also phasing out the Senior <br />Citizen Discount by the ��ar 2�1 l. Actuai ra�e increases under th� new system were <br />effective January 1, 2009. The 2012 rate increase is 2%, tl-►e overa�l revenue budgeted far <br />2012 is a decrease of 7.32% over 2011. <br />�he 2012 operating budget is an increase oF 0.7% from the previous year's budget and an <br />overall decr�ase of 24.29% with capita.I outlay. Capital O�tlay costs include Sewer <br />LininglRehabiiitatior�, Inflow & Infiltra�ion (I&I) Mitigativn, and the I-694/TH S 1 <br />Interchange Project. A� operating transfer has also l�een budgeted to tk�e Equipzx�ent, <br />Building, and Replacernent Fund. <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.