Laserfiche WebLink
PARK EVALUATION RESULTS <br />FREEWAY PARK <br />Recent Improvements <br />Park sign was repainted in 2009. <br />Basketball court was resurfaced in fall 2009 /spring 2010. <br />Playground mulch was replenished. <br />Future Improvements Scheduled for Park <br />Park swing that was damaged was removed and replaced with regular park <br />bench in 2011. <br />One park bench was added as part of bench implementation in 2011. <br />Rankings <br />1. Variety of Park Amenities 3.6 avg 7 responses <br />2. Condition of Amenities 3.9 avg 9 responses <br />3. Park Upkeep 4.0 avg 8 responses <br />4. Trails N/A 0 responses <br />5. Adequate Resting 3.6 avg 7 responses <br />Benches /Resting Spots <br />6. Park Signage 3.9 avg 7 responses <br />7. Natural Beauty 3.6 avg 7 responses <br />8. Overall Appearance 3.7 avg 9 responses <br />OVERALL AVERAGE 3.8 avg <br />Final Comments — Suggestions for Improvements <br />• rain garden being installed <br />• 2 new benches to be installed <br />• lower park looks great <br />• rain garden needs help <br />• amentities are good for a neighborhood park <br />• nicely mowed <br />• new potty enclosure <br />• playground entrance sign is overgrown with brush <br />• sign shows a teeter totter — need proper signage <br />