Laserfiche WebLink
PARK EVALUATION RESULTS <br />INGERSON PARK <br />Recent Improvements <br />Park sign was painted the summer of 2009. <br />Basketball Court was reconstructed and resurfaced in 2010. <br />Outdoor bathroom was added to the park. <br />Future Improvements Scheduled for Park <br />Playground mulch is scheduled to be added in 2012. <br />Rankings <br />1. Variety of Park Amenities 3.3 avg 8 responses <br />2. Condition of Amenities 3.7 avg 7 responses <br />3. Park Upkeep 4.0 avg 9 responses <br />4. Trails N/A 0 responses <br />5. Adequate Resting 3.6 avg 8 responses <br />Benches /Resting Spots <br />6. Park Signage 3.8 avg 8 responses <br />7. Natural Beauty 4.2 avg 9 responses <br />8. Overall Appearance 4.6 avg 7 responses <br />OVERALL AVERAGE 3.9 avg <br />Final Comments — Suggestions for Improvements <br />• good use of limited potential of terrain <br />• small but nice park <br />• nice shelter <br />• one of our favorites <br />• great play structure <br />• graffiti on shelter is roof <br />• picnic table by Y2 court is in tough shape <br />• the slope of land minimizes summer use <br />• should use weed killer application <br />• very nice basketball court <br />• lots of clover <br />• a few weeds in big toy mulch <br />