Laserfiche WebLink
PARK EVALUATION RESULTS <br />PERRY PARK <br />Recent Improvements <br />New picnic tables in 2010 and 2011. <br />Caps for ball field fence tops installed in 2009. <br />Park sign was repainted in 2009. <br />Trail down to the Tony Schmidt Elmer L. Anderson Memorial Trail completed in <br />2010. <br />Future Improvements Scheduled for Park <br />Would like to add outfield and /or sideline fencing on Perry #3. It is not in budget <br />or C I P at this time. <br />Rankings <br />1. Variety of Park Amenities 4.4 avg 9 responses <br />2. Condition of Amenities 4.1 avg 9 responses <br />3. Park Upkeep 4.4 avg 9 responses <br />4. Trails 4.4 avg 9 responses <br />5. Adequate Resting 4.4 avg 8 responses <br />Benches /Resting Spots <br />6. Park Signage 4.1 avg 9 responses <br />7. Natural Beauty 4.2 avg 9 responses <br />8. Overall Appearance 4.4 avg 9 responses <br />OVERALL AVERAGE 4.3 avg <br />Final Comments — Suggestions for Improvements <br />• drainage very poor — probably needs cut out clay base <br />• primarily basketball and softball — but something for everyone <br />• ball fields drain poorly <br />• special ball park — great picnic shelter <br />• field problems — all else good <br />handicap porta potties — super <br />• outstanding new pavilion <br />• excellent amenities <br />• drainage /erosion issue at turn below ballfield <br />• sign is hard to see from the road <br />