Laserfiche WebLink
ARDEN HILLS CITY COUNCIL –June 13, 20119 <br />8.A.Valentine Park Improvements (continued) <br />Public Works Director Maurer <br />stated the drainage would be resolved with the design stage of <br />planning. This will provide the information needed to determine what will be needed for the <br />drainage. <br />Councilmember Holmes <br />suggested the proposed parking lot be moved so when you come into <br />the park rather than taking a right into the parking area,a person would take a left. The park <br />amenities could then be moved to the other sidewhich would keep them away from the homes. <br />The amenities would be closer to the lake so when parents are watching their children at the park <br />they can look at the lake. <br />Public Works Maurer <br />stated the neighborhood did provide input regarding the location of the <br />park amenities. The residents had requested a half basketball court in order to reduce the noise <br />and some of the play areas were moved further from the homes. If the park amenities were <br />moved,theywould be closer to the road, which could be a problem for smaller children. The <br />design phase will look at the drainage and how to best utilize the green space and where to put the <br />amenities. He suggested having the project move into the design phase and then bring a couple of <br />concept plans to the residents to consider. Once the drainage has been resolved,the potential <br />location for amenities can be determined. He suggested having an open house in thepark so <br />residents could see where in the park the amenities could be located. He emphasizedthatat this <br />time the design phase would be needed in order to determine what would need to be done to <br />resolve the drainage issues and once this is determined thelocation and types of amenities can be <br />finalized. <br />MayorGrant <br />asked when construction would take place. <br />Public Works Director Maurer <br />stated construction could start later this summer and be <br />completed the following summer or construction could be donein 2012. It would be better for the <br />residents to do the construction in the spring of 2012 since the residents do not use the park in the <br />spring due to the flooding. <br />Councilmember Holden <br />stated she would like to see some form of play area in the shadedarea <br />of the park for the kids. She does not like the tree house concept but would like to see something <br />in this area of the park. <br />Councilmember Holden <br />asked what the interpretive signs were. <br />Public Works Director Maurer <br />stated the signs would integrate the drainage facilities into the <br />park and make it feel like part of the park. <br />Councilmember Holden <br />stated the signs for the Elmer L. Anderson signs were already damaged. <br />Parks and Recreation Manager Olson <br />stated she was aware of damage to the Ramsey County <br />sign and has been working with the signvendor and Ramsey County on this. <br />Councilmember Holden <br />stated the other ice rinks in the City have hockey players on them and <br />this does make it difficult for recreational and beginner skaters to enjoy the rink. <br /> <br />