My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2C, Valentine Park Improvement Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
09-19-11-WS
>
2C, Valentine Park Improvement Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 9:48:09 AM
Creation date
9/16/2011 4:12:12 PM
Metadata
Fields
Template:
General
Document
City Council Work Session Sept 19, 2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />DATE:September 19, 2011 <br />TO:Honorable Mayor and City Councilmembers <br />Patrick Klaers,City Administrator <br />FROM:Terry Maurer, Public Works Director <br />Michelle Olson, Parks and Recreation Manager <br />SUBJECT:Valentine Park Improvement Update <br />Background <br />The Valentine Park Improvements were last before the City Council at the June 13, 2011 <br />Meeting. For your information the council memo(Attachment A) and the minutes <br />(Attachment B) fromthe June 13, 2011 meeting are attached. <br />Since June a detailed drainage design relative to the neighborhood draining through the <br />park to Valentine Lake has been completed. It has been determined that a park and a <br />drainage system can co-exist on the property and can be constructed in such a manner as <br />to protect the park amenities and adjacent properties. In general this will be accomplished <br />by constructing a plateau at approximately elevation 882 which will contain the park <br />amenities and parkinglot. This area will still be almost two feet below the lowest home <br />opening adjacent to the park which is at elevation 883.91. The remaining park property <br />will be used for a detention pond, rain garden sized to accommodate a large portion of the <br />neighborhoods requirement when the streetsare reconstructedand a large grass area. <br />At the June 13 meeting there was a question about where to place the park amenities; on <br />the western side of the park nearer the adjacent homes or the east side of the park nearer <br />the street. Attached are two conceptual drawings (Attachment C) showing the same park <br />amenities, detention pondand rain garden. Staff is looking for direction on the general <br />layoutof the park/drainage improvements. <br />A more specific cost estimate has been prepared by design item since the final layout has <br />not been finalized yet. The cost estimates is as follows: <br />City Council Meeting <br />\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\091911ValentineParkMemo.doc <br />Page 1of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.