Laserfiche WebLink
CITY OF ARDEN HILLS <br />PAY ESTIMATE # 3 <br />FOR WORK COMPLETED THROUGH 10/5/2011 <br />2011 Pavement Management Program <br />TO DATE <br />TOTAL <br />AMOUNT <br />0 <br />G <br />,i <br />en <br />,..0 <br />— <br />EA <br />CD <br />0 <br />6 <br />00 <br />00 <br />Eli <br />CDOGOG <br />G CD <br />6 6 <br />cr. (-4 <br />Cr, ,C) <br />6,3 ,I- <br />EA <br />CD <br />6 <br />.0 <br />,f) <br />E A <br />0 <br />6 <br />c4 <br />rn <br />'s <br />.— <br />EA- <br />G <br />6 <br />CD <br />C) <br />vi <br />--- <br />oe <br />,— <br />CT <br />00 <br />kri <br />ON <br />kr; <br />EA <br />QUANTITY <br />COMPLETED TO <br />DATE <br />CD <br />0 <br />. <br />M <br />CD <br />CD <br />. <br />•-- <br />3.00 <br />1.00 <br />0 <br />G <br />•-- <br />G <br />CD <br />,--- <br />0 <br />0 <br />0 <br />0 <br />,-- <br />AMOUNT <br />PREVIOUS <br />ESTIMATE <br />0 <br />G <br />,i <br />en <br />.0., . <br />EA <br />CD <br />G <br />6 <br />oo <br />00 <br />CD G <br />G C) <br />6 6 <br />C (-4 <br />C .0 <br />EA ' <br />.- <br />EA <br />C:, <br />0 <br />6 <br />.0 <br />.0 <br />EA <br />0 <br />0 <br />6 <br />(-4 <br />en, <br />— <br />EA <br />G <br />G <br />6 <br />b•e?., <br />' <br />CD <br />G <br />vi <br />— <br />en <br />00' <br />— <br />EA <br />$711,435,40 <br />QUANTITY <br />PREVIOUS <br />ESTIMATE <br />CD <br />CD <br />. <br />,1 <br />rn <br />G <br />G <br />. <br />.--- <br />3.00 <br />1.00 <br />G <br />G <br />.— <br />0 <br />CD <br />,— <br />0 <br />G <br />CD <br />CD <br />0 <br />— <br />EST. TOTAL COST <br />0 <br />G <br />,i <br />— <br />■0 <br />fzi)- <br />$ 880.00 <br />CD G <br />0 G <br />kri 6 <br />VI ,1 <br />— VD <br />— ..,t-' <br />.v, EA <br />G <br />6 <br />■.0 <br />, -C <br />EA- <br />0 <br />6 <br />.7t. <br />,C <br />r.i. <br />6,1 <br />CD <br />kri <br />— <br />rn <br />, <br />oo <br />— <br />, <br />C, <br />CY; <br />ON <br />t---- <br />, <br />kr, <br />.0 <br />c <br />EA <br />EST, TOTAL <br />QUANTITY <br />G <br />CNI <br />_ <br />G <br />- <br />— <br />3.50 <br />1.00 <br />G <br />___ <br />CD <br />(., <br />G <br />— <br />UNIT PRICE <br />G <br />G <br />— <br />to <br />EA <br />880.00 1 <br />$ 330.00 <br />$ 4,620,00 <br />G <br />G <br />6 <br />,C...) <br />,..0 <br />EA <br />G <br />G <br />6 <br />(-NI <br />rn <br />— <br />EA. <br />$ 18,315.00 I <br />,— <br />7 <br />T LF <br />< <br />LF <br />EA <br />< <br />EA <br />< <br />ITEM DESCRIPTION <br />CHANGE ORDER 1 <br />18" RC PIPE SEWER, CL V <br />18" RC PIPE APRON (W /TRASH GUARD) <br />CONSTRUCT CATCH BASIN TYPE A <br />CONSTRUCT OUTLET STRUCTURE <br />CATCH BASIN CASTING R -4342 <br />CONNECT TO EXISTING STRUCTURE <br />ALTERNATE 2 <br />CONSTRUCT ECO STORM STRUCTURE 1.0 (6' DIAMETER) <br />TOTAL PROJECT COST <br />ITEM NO. <br />c <br />1 24 <br />26 <br />27 <br />28 <br />