Laserfiche WebLink
City of Arden Hills Chapter 3 Licenses and Regulations <br />FF. <br />T- e words "`Probationary Period," : ,one year from the date <br />that a person has been notified in writing that they have been put on <br />probation. <br />GG. Theword-AiRegistranti any person who: <br />HH. <br />II. <br />1. Has or seeks to have its equipment or facilities located in any <br />right -of -way; or <br />2. In any way occupies or uses, or seeks to occupy or use, the <br />right -of -way or place its facilities or equipment in the right -of- <br />way. <br />The words "Restore' or R R estoration. " s The process by <br />which an excavated right -of -way and surrounding area, including <br />pavement and foundation, is returned to the same condition and life <br />expectancy that existed before excavation. <br />T 61 "Restoration Cost." _ The amount of money paid to <br />the City by a permittee to achieve the level of restoration according to <br />plates 1 to 13 of Minnesota Public Utilities Commission rules. <br />JJ. Right -of -Way Permit. Either the excavation permit or the obstruction <br />permit, or both, depending on the context, required by this section. <br />KK. The words "Public Right -of -Way Public. "means- tAhe area <br />dedicated to public use, in <br />the publicthe—City has a dedicatedn interest, for <br />Y!� <br />which <br />travel purposes and public utility, <br />3 -7 <br />Adopted December 17, 2001 <br />