My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-11 EDC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2011
>
10-19-11 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2011 11:33:47 AM
Creation date
10/14/2011 11:21:56 AM
Metadata
Fields
Template:
General
Document
EDC Packet
General - Type
EDC Packet
Category
EDC Packet
Date
10/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In St. Louis Park, the corridor project included pedestrian and street lighting, median <br />landscaping, custom bus shelters, paving, retaining walls and boulevard plantings. The project <br />involved close coordination with Hennepin County and was subject to the County's roadway and <br />aesthetic design policies. <br />Central Avenue — Osseo <br />To accommodate projected <br />residential and commercial growth <br />and to maintain a vibrant downtown <br />business district, Central Avenue's <br />infrastructure required a major <br />upgrade of utilities, roadway <br />pavement, and streetscaping. High <br />quality streetscape improvements <br />reflect the City's sentiments and <br />dedication toward downtown Osseo. <br />Gateway monuments greet visitors <br />at both ends. Decorative paver <br />sidewalks direct pedestrians along a <br />corridor of ornamental trees, planter <br />boxes, benches, bollards and waste receptacles. The street is lined with decorative LED lighting <br />with poles that support banners, flagpoles, and hanging baskets. The boulevard was constructed <br />using pervious pavers, reducing storm water runoff into the street and storm sewer. <br />Key Elements of Corridor and Streetscape Projects <br />The corridor and streetscape projects in Shakopee, Hopkins, St. Louis Park, and Osseo have key <br />elements that the City of Arden Hills may need or want to incorporate into the B -2 <br />Implementation Plan. These include: <br />• Extensive communication with and input from the business community on access <br />changes and construction schedule; <br />• Coordination with the county for curb -to -curb spacing and design; <br />• Optimization of existing right -of -way; <br />• Consideration of vehicle, bicycle, and pedestrian movements; and <br />• Implementation recommendations that adhere to the community's needs and budget; <br />B2 Implementation Plan <br />Staff recommends that the Scope of Work for the B -2 Implementation Plan be divided into two <br />phases. The first phase will be focused on gathering and analyzing information. At the end of <br />City of Arden Hills <br />City Council Work Session October 17, 2011 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.