Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
City of Arden Hills Chapter 10 Utilities <br />1. The charge shall be payable on the issuance of each building permit for <br />new construction issued. <br />2. A charge shall be payable on the issuance of a building permit for <br />alterations or additions to existing buildings if the alteration or addition <br />will require additional reserve capacity, and the service availability <br />charge (SAC) unit shall be determined on the same basis as for new <br />buildings. <br />C. The charge for each building shall be the product of the number of units of <br />sewage volume which it will discharge and the dollar figure established by <br />Ordinance adopted by the Council for the year in which the building permit is <br />issued. A unit of sewage volume shall be one hundred thousand (100,000) <br />gallons per year and shall be assigned as follows: <br />1. Single-family houses, townhouses and duplex units shall each comprise <br />one unit. <br />2. Condominiums and apartments shall each comprise eighty (80%) <br />percent of a unit. <br />3. Mobile homes shall each comprise eighty (80%) percent of a unit. <br />4. Other buildings and structures shall be assigned one unit for each one <br />hundred thousand (100,000) gallons of flow or part thereof which it is <br />estimated they will discharge. <br />5. Public housing units and housing units subsidized under any federal <br />program for low and moderate income housing shall be counted as <br />seventy-five (75%) percent of the unit equivalent for that type of <br />housing. <br />Subd. 3 Administration. The City Administrator shall prepare or revise building permit or <br />sewage connection permit application forms to provide information necessary for the <br />computation of the number of SAC units assignable to the building or structure in question, <br />and shall collect the applicable charge before issuance of a permit. The City Administrator <br />shall make such information available to the MCES upon request. If upon filing a report <br />covering the permit with the metropolitan MCES. They may determine that a greater number <br />of units is assignable to the building or structure in question, any additional amount of cost <br />allocated to the City as a result shall be paid by the person or company to whom the permit <br />was granted. <br />1010.13 Underground Installation of Distribution Lines. <br />10-23 <br />Adopted December 17, 2001 <br />