ARDEN HILLS CITY COUNCIL WORK SESSION—OCTOBER 17, 2011 8 <br /> - Work with Ramsey County to determine project scope and goals. <br /> o Reaffirm the County's acceptance of the B-2 Guiding Plan. <br /> o Determine space needs within the right-of-way. <br /> - Determine a public participation process. <br /> o Promote business participation in discussions of streetscape and amenities. <br /> o Work individually with businesses to determine access needs and vehicle/ <br /> pedestrian movements onto and within their sites. <br /> - Evaluate utilities along County Road E. <br /> o Determine whether utility upgrades are necessary. <br /> o Work with Xcel Energy to consider options for electrical boxes. <br /> o Provide cost estimates for any necessary utility upgrades. <br /> - Evaluate traffic and transportation options. <br /> o Update the 2008 traffic study and include pedestrian movements. <br /> o Suggest options for traffic improvements without a new signalized intersection. <br /> o Investigate options for an alternative access for the Arden Plaza development. <br /> - Summarize Phase I findings. <br /> o Provide a preliminary project budget. <br /> o Provide project and decision matrix timelines to align planning, design, and <br /> construction with the reconstruction of the Highway 51 bridge. <br /> Community Development Director Hutmacher explained that in Phase II, improvements <br /> identified in Phase I will be designed. Cost estimates, specifications, and a construction timeline <br /> and phasing schedule, if necessary, will be prepared. At the end of Phase II,the City will be ready <br /> to proceed to bidding and the construction of improvements. <br /> Community Development Director Hutmacher then reviewed the Budget Implications as <br /> outlined in the draft 2012 — 2016 Capital Improvement Plan (CIP). She explained that the City <br /> may assess a portion of the cost of improvements to adjacent properties. Development <br /> Agreements for Select Senior Living and Arden Plaza contemplate an assessment rate of not more <br /> than $350.00 per lineal foot along County Road E. Assessments for properties that redevelop <br /> prior to the construction of County Road E improvements may be based on improvements made <br /> by the property owner at the time of the redevelopment. In addition to CIP funds designated for <br /> County Road E improvements, $150,000 from PIR funds is programmed for the Highway 51 <br /> bridge replacement in 2014. The majority of the planning and design funds will be needed in <br /> Phase II of the Implementation Plan. Work products of Phase I include a preliminary budget, an <br /> identified assessment method for B-2 properties, and options for public funding. <br /> Community Development Director Hutmacher stated that the draft 2012-2016 CIP designates <br /> $278,000 for planning and design of County Road E improvements. Based on prior projects, staff <br /> believes that approximately 20 per cent of the planning and design costs, or $50,000 to $55,000, is <br /> needed for the planning and analysis work described in Phase I of the Scope of Work. <br />