My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B, Elmer L. Andersen Memorial Trail Connections Payment 7 to American Liberty Construction, Inc.
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
12-12-11-R
>
5B, Elmer L. Andersen Memorial Trail Connections Payment 7 to American Liberty Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:42:51 AM
Creation date
12/9/2011 7:30:17 AM
Metadata
Fields
Template:
General
Document
December 12, 2011 Reg City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EN HILLS <br />MEMORANDUM <br />DATE: December 12, 2011 <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br />FROM: Kristine Giga, Civil Engineer <br />SUBJECT: Elmer L. Andersen Memorial Trail Connections- Payment #7 <br />Background <br />The City of Arden Hills awarded American Liberty Construction, Inc., of Rockford, <br />Minnesota, the Elmer L. Andersen Memorial Connections Trail Project on February 22, <br />2010, for a total contract amount of $458,800.. On June 28, 2010, the City Council <br />approved modifications to the contract for a total revised contract amount of <br />$474,616.83. <br />Discussion <br />This pay request includes work completed through December 2, 2011. The payment is for <br />$20,545.35 and includes subgrade excavation, placement of rip rap, seeding and erosion <br />control blanket, street sweeping, and erosion control measures. <br />This pay request also includes Work Order #1, Supplemental Agreement #3, and <br />Supplemental Agreement #4. Work Order #1 is for the relocation of the speed sign that <br />was not receiving enough sunlight to charge the battery and work properly. Supplemental <br />Agreement #3 includes storm sewer modifications due to an unexpected high water table, <br />as well as repair to deteriorated pipe that was discovered during construction once the <br />pipe was exposed. Supplemental Agreement #4 includes hydrant adjustments. The <br />existing ground elevation at the new location of the hydrants was higher than the original <br />location, requiring extensions on the hydrants so that the fire department could access the <br />nozzles. One of the hydrants was too high, and needed to be lowered. <br />City Council Meeting <br />\�1Vletro-inet.us\ardenhills�PR&PW�Engineering\Council Actions�2,011\12-12-11Memo_ELA Payment#7.doc <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.