My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5M, Motion to Approve Ordinance 2011-013 Amending Chapter 15 of the Erosion and Sediment Erosion and Sediment Control Ordinance
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
12-12-11-R
>
5M, Motion to Approve Ordinance 2011-013 Amending Chapter 15 of the Erosion and Sediment Erosion and Sediment Control Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:13:21 AM
Creation date
12/9/2011 7:38:30 AM
Metadata
Fields
Template:
General
Document
December 12, 2011 Reg City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance <br />Projects coordinated by Ramsey County or Mn/DOT do not require a permit; however, <br />the PWD shall be notified of the project and be provided a copy of the Erosion and <br />Sediment Control Plan, as well as an estimated schedule for commencement and <br />completion. The PWD shall notify the designated contact if erosion control measures <br />should fail or require maintenance with the expectation that the deficiencies will be <br />corrected. <br />If no permit has been obtained, a stop work order may be issued on the construction and a <br />fine may be issued in an amount equal to twice the required permit fee. A completed <br />Erosion and Sediment Control Plan and permit application shall be submitted before <br />construction will be allowed to resume. <br />Obtainin�a permit does not exempt the Permittee from obtaining permits required bv <br />other governmental a egi ncies• <br />- D '**�c-cc �e��'vcccrrr�`tncir-ap"� •,1•1� �••;�� '��" 1 '• � t_ � <br />> > " viii ub b <br />4 l:vr.i4e� 4i. 4�0 � ll�..�.irrr•. <br />) <br />♦ � � � � � � � � ♦ � � . � - <br />- ` � � - <br />� � \ <br />- 0,:.�0 � ��... e:.� �n <br />Subd. 2 Application Fee. The Permittee shall submit an application fee as specified on the <br />City's Fee Schedule as adopted and revised annually by the City Council by ordinance. The <br />fee is non-refundable and shall cover any review costs accrued within one (1) year of the date <br />of payment. <br />Subd. 3 Criteria. The Erosion and Sediment Control Plan shall minimize soil erosion or <br />sediment from damaging adjacent land. A Permittee engaged in a Land Disturbance Activity <br />shall submit an Erosion and Sediment Control Plan that will minimize soil erosion or <br />sediment from damaging adjacent land, bodies of water, watercourses or wetlands to the <br />PWD for approval. <br />The Erosion and Sediment Control Plan shall address the following criteria: <br />A. Conform to the natural limitations presented by topography and soil so as to create <br />the least potential for soil erosion. <br />B. Stabilize all exposed soils and soil stockpiles; <br />C. Establish permanent vegetation; <br />D. Prevent sediment damage to adjacent properties and other designated areas; <br />E. Schedule of erosion and sediment control practices; <br />1500-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.