My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B,Motion to Adopt Resolution 2012-005 – Accepting Work Completed and Authorizing Final Payment of $71,970.22 for the 2011 Sanitary Sewer Lining Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
01-30-12-R
>
5B,Motion to Adopt Resolution 2012-005 – Accepting Work Completed and Authorizing Final Payment of $71,970.22 for the 2011 Sanitary Sewer Lining Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:14:05 AM
Creation date
1/27/2012 2:50:19 PM
Metadata
Fields
Template:
General
Document
January 30, 2012 Reg. City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br />�R�N�HILLS <br />MEMORANDUM <br />DATE: January 30, 2012 <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br />FROM: Kristine Giga, Civil Engineer /�� <br />SUBJECT: 2011 Sanitary Sewer Lining Project- Payment #2 and Final <br />Back�round <br />The City of Arden Hills awarded Insituform Technologies, USA, Inc. of Chesterfield, <br />Missouri, the 2011 Sanitary Sewer Lining Project on March 28, 2011, for a total contract <br />amount of $399,444.50. <br />The project has been completed in accordance with the plans and specifications. <br />Financial Implications <br />The final contract amount, $386,730.20, is $12,714.30 less than the awarded amount of <br />$399,444.50. This represents a decrease in the contract of 3.2%. The cost decrease is the <br />result of the actual quantities being lower than estimated quantities. There are a few <br />factors that resulted in these decreased quantities: <br />• One segment of pipe on New Brighton Road was not lined, because the upstream <br />manhole is not a full sized manhole that allowed adequate access. There is only <br />one service off of this line, therefore the Public Works crews felt this line could <br />be monitored and addressed at a future time if needed. <br />• The configuration of the sanitary sewer and manhole locations on the Land O' <br />Lakes property is different than what is shown on original construction plans, and <br />some of the pipe sizes are smaller than records indicated. <br />• Throughout the project area, some of the pipe segments were different lengths <br />than records indicated. Overall, the total pipe length was shorter than estimated. <br />The City's records will be updated to reflect the corrected information gathered in the <br />field with this project. <br />City Council Meeting <br />\�1VIetro-inet.us\ardenhills�PR&PW\Engineering\Council Actions�2012\1-30-12Memo_2011SewerLiningPayment2-Final.doc <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.