My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5C, Resolution 2012-004 – Awarding Contract for Lift Station #13
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
01-30-12-R
>
5C, Resolution 2012-004 – Awarding Contract for Lift Station #13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:14:07 AM
Creation date
1/27/2012 2:51:47 PM
Metadata
Fields
Template:
General
Document
January 30, 2012 Reg. City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EN HILLS <br />MEMORANDUM <br />DATE: January 30, 2012 <br />TO: Honorable Mayor and City Councilmembers <br />Patrick HIaers, City Administrator <br />FROM: Ter Maurer, Public Works Director � <br />rY <br />SUBJECT: Lift Station #13 Reconstruction Bids <br />Background <br />The 2011 Capital Improvement Plan (CIP) included a sanitary sewer item to rebuild lift <br />stations 11 and 13. Lift Station #11 is located at 1861 Highway 96 which is the main <br />entrance to the manufactured home park. That lift station was dropped from the project <br />because of the US 10/Hwy 96 Grade Separation Project planned for 2013 which may <br />affect the existing lift station. Lift Station #13 is located at the intersection of Karth Lake <br />Drive and Pleasant Drive. The CIP item, a copy of which is attached, prograinmed <br />$385,000 for the reconstruction of both lift stations. . <br />Seth Peterson of Bolton and Menk was hired to provide engineering services for the <br />reconstruction. The project was bid on Tuesday, December 6, 2011. The bid also <br />included four alternate items for various upgrades at lift stations 2, 5, 7 and 8. After the <br />bid opening the alternative bid items were evaluated and it was decided that they were <br />too costly and there was a more cost-effective method of getting this work done so only <br />the base bids are being considered for award. There were a total of eight bids received. <br />The following table contains the bidder and their base bid for the reconstruction of lift <br />station # 13. <br />City Council Meeting <br />P:�Admin\Council�Agendas & Packet Information�2012\01-30-12 Reg Mtg�Packet Information\1-30-12LiftStationl3Bids.doc <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.