My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Lift Station Updates - Modifications
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
01-30-12-R
>
8A, Lift Station Updates - Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:14:17 AM
Creation date
1/27/2012 3:06:18 PM
Metadata
Fields
Template:
General
Document
January 30, 2012 Reg. City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t� <br />f ��i <br />ELECTR/C PUMP <br />201 4 Ave. SW PH# (800) 383-7867 <br />New Prague, MN 56071 FAX# (952) 758-7778 <br />* e�usting guide rail is galvanized. We have provided in our scope to replace with SS guide rail. <br />Three (3) 2" SS upper guide bar bracket <br />Three (3) SS cable holder <br />Three (3) SS Chain assembly for lifting <br />$42,400 <br />One (1) Control Panel- panel will duplicate LS13 in design. <br />$31,800 <br />One (1) ATS (Automatic Transfer Switch) — Upon inspection of the station we discussed the ability of the <br />station to be remotely started should a loss of power occur at your main lift station. The control panel <br />would be provided with an ATS to allow for that automatic switching without personnel present to <br />minimize downtime. Confirmation of existing gen sets ability to "auto start" would be required. This <br />requires some additional space in the enclosure. For the Owner's benefit, we have shown this as an adder <br />to the base panel. <br />$5000 <br />One (1) Lot of Labor to install above pumping equipment. Install includes necessary bypass of pump <br />station to install base elbows and any miscellaneous hardware. <br />$ 14,000 <br />Total Price (Including Adder for ATS) $ 93,200 <br />Start-up and Freight are Included <br />Note: Hoist, Junction Box, Valves, Gauges, Piping, Electrical install and anything not <br />specifically mentioned in the above quote is not included in our pricing. This quotation is <br />based on our inspection of the station at time of this proposal. This quote includes only <br />material and services listed, and is subject to modification based on changes in the field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.