My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Lift Station Updates - Modifications
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
01-30-12-R
>
8A, Lift Station Updates - Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:14:17 AM
Creation date
1/27/2012 3:06:18 PM
Metadata
Fields
Template:
General
Document
January 30, 2012 Reg. City Council Meeti
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���provement Plan <br />.�ty of Ard� �3� Mu�nesota <br />�roject tt IO-Sew-O(13 <br />•�oje�t Name Reconstruct Lift Stations 11 and 13 <br />.�.ype �rt�provemertt Department Sanitary Sewer D���ent <br />Contact Public Works D�rector <br />Usefui Life <br />Utit� Impro�emen[s Priority n�a <br />Category h` <br />��* �n i'otal Project Cost: $38�,000 <br />_. c_,, i:a �rar.�� ic 25 vears. <br />,.�`�....r.___ � � Y g P r .... .. .... ,------- — - <br />?rnject to rep�ace lift statiorts i 1 1861 Hi hwa 96) and i3 {1123 Kartt► Lake Drive . e avera <br />vew pumPs and electrical panels wouid be installed. The new pumps and panels wouid be compatible with the other 141ift stations focated <br />;hroughout the Ciry. <br />EnQineering/Design alread�• completed, fiotvever, a review shouid be completed to ensure no design mod►fications are needed. <br />Lift Station # t 1 mav be impacted by �e Highway t0/County Rd 96 <br />Jus 't�fication <br />The lift stations are over 40 years oid and in need of replacement_ <br />Expenditures 201 l 2012 <br />2013 2014 2015 "1"ota� <br />t0.000 <br />Planning/Design »��� 375,000 <br />Construciion/Mai�tenance 375,006 <br />385,000 <br />Total 385,000 <br />2011 thru ZQ15 <br />20t1 2012 2013 2014 2015 Total <br />Funding Sources 385,000 <br />Sanitary Sewer Util�ty Fund 385,000 385,000 <br />Total 3s5,000 <br />Budget Impact/Other � <br />'ump repair costs should decrease as a result of this project. <br />scheduled for 201 l _ <br />Wedrresday. November !0. 2010 <br />Produced Using the Plan-It CaP'�°I P�°nning Software 6 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.