• If the project is not undertaken in 2012, it would be best to wait past the US <br /> 10/Hwy 96 project in 2013 and not do the work the same year the bridge over TH <br /> 51 is replaced, which is currently scheduled for 2015 in Mn/DOT's plan. <br /> • There are only about 27 properties that could be assessed for the street work. This <br /> is a very small number relative to the length and cost of the project. The City's <br /> Assessment Policy will not be applicable to this situation. A modification will be <br /> necessary. <br /> The only recommendation staff would have is if doing the Old Snelling Avenue project in <br /> 2012 will make it difficult to proceed with some of the neighborhood streets in the CIP <br /> we would rather wait on the Old Snelling project due to the calls we have received from <br /> some residents in future PMP project areas and the number of water main breaks we deal <br /> with in those neighborhoods. There are no serious utility issues on Old Snelling that need <br /> attention and we will be able to maintain the current street surface for a few more years. <br /> Staff s intent was to have this discussion at a work session so if there is some Council <br /> thought that the Old Snelling project can wait a few more years then the draft feasibility <br /> study will just be filed until the project is scheduled. <br /> City Council Meeting <br /> P:\Admin\Council\Agendas&Packet Information\2012\01-30-12 Wk Sess\Packet Information\1-30- <br /> 12 SnellingAvenueDiscus Sion.doc <br /> Page 2 of 2 <br />