My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
02-08-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 5:00:16 PM
Creation date
2/2/2012 4:15:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lt <br /> ,i UVEN HILLS <br /> MEMORANDUM <br /> DATE: February 8, 2012 PC Agenda Item 5.A <br /> TO: Planning Commission <br /> FROM: Meagan Beekman, City Planner <br /> SUBJECT: Report from the City Council <br /> B2 Implementation Plan Update <br /> The City Council directed Staff to enter into a contract with Bolton &Menk for Phase I of the <br /> B2 Implementation Plan. According to the approved Scope of Work, at the end of Phase 1,the <br /> City will have analyzed options, obtained input from business owners, and defined specific <br /> objectives and a preliminary construction budget. As part of Phase I,the City Council will <br /> appoint an Advisory Committee which will include representatives of the Council, business <br /> owners within the B-2 District,and staff. The Advisory Committee will begin meeting in mid- <br /> to late-February. <br /> In Phase 1I, improvements identified in Phase I will be designed. Cost estimates, specifications, <br /> and a construction timeline and phasing schedule, if necessary, will be prepared, and the City <br /> will be ready to proceed to bidding and the construction of improvements. <br /> In order to minimize business disruptions,the B-2 District Implementation Plan is scheduled to <br /> be completed so that improvements to County Road E can take place concurrently with the <br /> reconstruction of the bridge over Highway 51. <br /> Arden Plaza—Walureen's Update <br /> Since the Planning Commission and City Council's approval of the Arden Plaza redevelopment, <br /> CVS withdrew from negotiations with Arden Plaza and Walgreen's moved forward with <br /> purchasing Lot 1. At their December 19, 2011, work session the City Council met with <br /> representatives of Walgreen's to discuss the minor modifications proposed for the approved Lot <br /> 1 site plan. The Walgreen's building and layout would be substantially similar to that approved <br /> for the CVS; however,the building would be eight feet wider, reducing the drive-thru to one lane <br /> City of Arden Hills <br /> Planning Commission Meeting for February 8, 2012 <br /> PAPlanning\Planning Commission\CC Reports\02-08-12-PC report-CC report.doc <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.