My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B, Approve Ordinance 2012-003 Adopting the 2012 Fee Schedule
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
02-27-12-R
>
5B, Approve Ordinance 2012-003 Adopting the 2012 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:15:00 AM
Creation date
2/23/2012 11:18:32 AM
Metadata
Fields
Template:
General
Document
Feb 27, 2012 City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_...__ _. _ __.... —.. _ <br />Restoration of Typical Road Mix : $100.00 <br />Street <br />. <br />_ ...............................................................................................::....................................................................:...................................................................... <br />Restoration of Higher-Type I Set by Engineer <br />Street <br />__T__________ ----------_____T__:____-----___- -------- � ______---------- ___ � ----- �_____ <br />Larger than 1" Service Set by Inspector <br />Connection ± <br />Water Permits — Plan Check Fee � Set by Inspector <br />...................................................._..................................................................................................................................._....__................................................_.............................._................................ ...................................................................................................._...................................._........................ <br />Water Permits — Re-ins ection $38.00 <br />Water Meter/Spacer Charges — Fee includes removal of ineter, $130.00 <br />Customer Requested Water ; bench test at maintenance <br />Meter Accuracy Test facility, and returning meter to <br />; residence; Fee will not be applied <br />: if the meter is found to be <br />: inaccurate to a degree exceeding <br />: three percent (3%) from the <br />: result of the bench test <br />_ � — � �__ _.�_.. _ __ � ....�. <br />Water Meter/Spacer Charges — ; $380.00 <br />3/4" x 7 1/2" Meter <br />_ � .....................:.......:.....::........................................................................................._................_.........:....... ......................................................................................................:...................................:.......................... <br />. <br />Water Meter/Spacer Charges — Contact Public Works far Quote <br />3/4" x 9" Meter <br />Water Meter/Spacer Charges — $430.00 <br />1" Meter <br />_........_.--------------_______�_ �._ ___ ._. � .._....__:...__...;_-------__ -------- -_ _...:......______—_.___� ____.._____......----- <br />Water Meter/Spacer Charges — Contact Public Works for Quote <br />Greater than 1" <br />...................... ................... <br />_� ..................................................................................___.....................................................:....................... .::......:...................:......:_......_......................:...................:.:..........._...._....:......................_........................ <br />Water Connection Fee — $800.00 per acre or portion <br />Connection fee for previously thereof <br />un-served or expanded lots ; <br />� ._ � � ____.._-----,--------_ ; _ � ____ _____ __ �.__ _ � ___..___ .. _ ----___ _.____.._.._.__...-- ____. <br />Water Availability Fee — � The units are based on the $500.00 per unit <br />New ar Additional Connections Metropolitan Council's formula <br />for calculating new sewer <br />__ __ _______ � ' availabilit�_charge (SAC) units <br />_____ _ _ ___ _ _ � __ ----------------- _____ -------- <br />Sewer Connection Fee — $800.00 per acre or portion <br />Connection fee for previously thereof <br />un-served or ex�anded lots_ __ a <br />___�_ ______--------------_ ___ ___._____ ___.___ __ ______ ______________----------____ ___________ <br />Sewer Availability Fee — � The units are based on the $500.00 per unit <br />New or Additional Connections Metropolitan Council's formula <br />for calculating new sewer <br />; availability charge (SAC) units <br />__ _ _. _ _ __ _ _ _..___.....__._..._—._._ , _... _. _ _._......._.._..�.. <br />Sewer Permits — Service � Per inspection $38.00 <br />Installation/Alternations/Repairs ; <br />.............................:......................................................._............................................................:............................................................................:......................................................,............................................................................ <br />Sewer Permits — Plan Review i Set by Inspector <br />Fee <br />__. _ _ ___---_______________. � __ __.__� ------------ ___�____. � __. �____ � � �--- -----____________. ____________ <br />Sewer Permits — Reins ections <br />38.00 er hour <br />P .........................:................................................................................. . <br />_$ ................_...........�...._......................................................................... <br />Sewer Access Charge Set by Met Council Annually $2,365.00 <br />� <br />Sanitary Sewer Utility Prohibited � $100.00 per month <br />Sump Pump Connection <br />Surchar e <br />�� �' � �' S � � � � <br />� �.. <br />� � � -� �� ���,/� � � ��; �,: �=� � � �j s% <br />� .�� _ <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.