My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-07-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
03-07-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:59:49 AM
Creation date
2/28/2012 2:04:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
common area surface finishes will be upgraded as necessary. it is our understanding that the <br /> zoning code category to accommodate the foregoing is Single Room Occupancy units. <br /> It is our intention to market these apartments to students attending the local colleges and <br /> universities along with young professionals looking for a place to call their own while still having <br /> the social contact the common area amenities will provide. All residents will be thoroughly <br /> screened including back ground check process. The facility will be equipped with state of the <br /> art camera systems and 24 hour security staffing. <br /> The site worklexterior improvements incorporated in this application are consistent with the site <br /> and exterior work approved on November 22, 2010— planning case#10-009 including the <br /> construction of a concrete sidewalk; street tree requirements; parking lot lighting; fire sprinkler <br /> system; etc. It should be noted the aforementioned case provided for bicycle racks along the <br /> exterior of the building while this new development provides for a bike storage area inside the <br /> building. Planning case#10-009 required parking lot lighting additions subject to approval of the <br /> city planner and county sheriff which continue to be acceptable. <br /> RLK has provided an updated traffic study dated 1/30/12 (see attached) and has concluded that <br /> a market-rate apartment building will generate fewer trips than the previous hotel use. The <br /> apartment use combined with other potential uses on Lot 2 generate approximately the same <br /> trip generation as did the previous hotel use. <br /> We believe this development lends itself well with the city's B2 District Plan by providing for <br /> updated interior building and site improvements. Additionally the apartments will provide <br /> additional residential density (consistent with the B2 goals and objectives) and provide <br /> residents/customers eager to utilize the local businesses around them via the sidewalks and <br /> roadways planned for the B2 District. <br /> Sustainability-Arden Halt Apartments as an occupied and vibrant multi-purpose building fully <br /> utilizes a property in which our natural resources have already been invested. As one of your <br /> staff shared with me... "the'greenest' building is one that doesn't have to be built". <br /> We are requesting a lot split into two separate parcels: Lot 1 and Lot 2 (Lot 2 is proposed in <br /> concept form). We have secured a permit from Ramsey County to access Lot 2 from Lexington <br /> Avenue. <br /> Respectfully, <br /> Robin C. Davidson <br /> The Davidson Companies, Inc. <br /> cc: Stuart Nolan <br />
The URL can be used to link to this page
Your browser does not support the video tag.