Laserfiche WebLink
City of Arden Hills - 2030 Comprehensive Plan <br /> o Cummings Park— Explore the possibility of adding irrigation to the soccer <br /> fields. This will enhance the quality of the fields and allow for additional <br /> usage. Add benches along the paths and park amenities. <br /> o Floral Park—Additional unpaved looped paths could be constructed in the <br /> park to provide more walking and nature watching opportunities. Add <br /> benches along the paths and park amenities. <br /> o Freeway Park - Consider paving the hockey rink for year-round use. <br /> Upgrade existing half basketball court. <br /> o Hazelnut Park— Replace the warming house with a new structure and <br /> provide a safer access to the rink. Install shaded benches near <br /> recreational features. Add lights from parking lot to skating rink. Add a <br /> picnic shelter or pavilion to meet the usage demands of the park. <br /> o Ingerson Park—Add a connecting path to Lexington Avenue, Fernwood <br /> Court, and Lake Lane, utilizing a sewer easement to Fernwood as a path <br /> corridor and Lake Lane as a path access point. <br /> o Johanna Marsh — Resurface tennis courts, add a park sign, and add <br /> benches. <br /> o Lindey's Park_ Provide benches. Utilize the Bocce Golf Course for <br /> recreation programming. <br /> o Round Lake Open Space— Explore the possibility of adding a path <br /> connecting Old Highway 10 to the path west of Round Lake by easement <br /> or land acquisition. Add a parking lot at Parkshore Drive. Determine what <br /> type of amenities/fields meet the needs of the community and develop the <br /> park. <br /> o Royal Hills —Add a fence along the outfield and sideline of the ball field to <br /> minimize balls going into the woods. <br /> o Sampson Park—Add landscaping within the park to provide interest and <br /> improve aesthetics. Replace the parking lot surface of the basketball <br /> court with a colored, bituminous surface. <br /> o Valentine Park— Complete drainage study and drainage improvements <br /> for the future of the park. Future Improvements are contingent upon the <br /> results of the study: Consider reconfiguring parking lot to detach park <br /> Approved: September 28, 2009 <br /> 9-7 <br />