My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-12 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2012
>
03-20-12 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 7:02:49 AM
Creation date
3/16/2012 9:55:54 AM
Metadata
Fields
Template:
General
Document
3-20-12 PTRC Packet
General - Type
3-20-12 PTRC Packet
Category
3-20-12 PTRC Packet
Date
3/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills- 2030 Comprehensive Plan <br /> Table 9.2 -Trail Improvement List <br /> Segment Proposed Trail Location Length <br /> Feet Miles <br /> A Cleveland Ave. (County Road"D"to Stowe Ave.) 2,623 0.5 <br /> A.2 Cleveland Ave. (Thom Ct.to existing path off Cty E2) 1,672 0.32 <br /> B County Road D(Cleveland to New Brighton Road) 2,644 0.5 <br /> C New Brighton Road.(County Rd.D to Stowe Ave.) 2,957 0.56 <br /> CA New Brighton Road(Stowe Ave.to County Road E2) 5,333 1.01 <br /> D County Road E2(New Brighton Rd.to Old Hwy.10) 3,309 0.63 <br /> DA County Road E2(Cleveland Ave.to New Brighton Rd.) 671 0.13 <br /> E R.C.Open Space(from Cty Rd.E2 to Venus) 686 0.13 <br /> E.1 R.C.Open Space(from segment E path to MVHS) 2,974 0.56 <br /> F Tony Schmidt Underpass trail North to County Road E2 (lift station rd.) 1,560 0.30 <br /> F.1 Perry Park Pavilion to Underpass Trail Head 1,399 0.27 <br /> G County Road E(Indian PI.to Lk.Joh.Blvd.to Tony Schmidt U.Trail to end of park-north side) 2,787 0.53 <br /> GA Lake Johanna Blvd.(From Segment G to Old 10-Snelling) 1,742 0.33 <br /> H County Road E(Old 10-Snelling to Connelly Ave.) 2,1851 0.41 <br /> 1 Snelling Ave.(Highway 51 to County Road E) 4,382 0.83 <br /> 1.1 Old Highway 10-Snelling(Cty Road E2 through CP Rail) 1,056 0.20 <br /> 1.2 Old Highway 10-Snelling(from CP Rail to County Rd.E2) 2,270 0.43 <br /> 1.3 Old Highway 10-Snelling(from Cty.Road E2 to Hwy.96) 8,870 1.68 <br /> J Lake Valentine Road(Mounds View H.S.to Old 10-Snelling) 2,258 0.43 <br /> K Parkshore Dr.(from Old Hwy 10-Snelling to beginning of Rd.Lake Trail) 2,3951 0.45 <br /> K.1 Gateway Blvd.(from proposed segment K to Round Lk.Road) 2,1651 0.41 <br /> K.2 Round Lake Trail(Complete the loop that has a gap behind Nott Co.) 2,421 0.46 <br /> K.3 Round Lake Road W.(from Gateway Blvd.to existing trail off of 96) 2,634 0.5 <br /> L County Road 96(Complete trail west from existing path to 35W) 3,941 0.75 <br /> M1 North Snelling Ave.(From County Road 96 to Briarknoll) 2,827 0.54 <br /> N County Road F(From Existing Sidewalk from Lexington to Hemline) 2,005 0.38 <br /> NA Hemline(From County Road F to Floral Drive 605 0.11 <br /> Q Lexington Ave.(From County Road F to County Road E) 5,280 1.00 <br /> 0.1 Lexington Ave.(From County Road E to Shoreline Lane) 5,212 0.99 <br /> 0.2 Lexington Ave.(From Tanglewood to County Road I-West Side) 7,890 1.50 <br /> P Crepeau Preserve (From Cannon to Crepeau Nature Preserve) 8381 0.16 <br /> P.1 Pine Tree Drive(From Cty Road E to existing grass trail into Crepeau) 1,2661 0.24 <br /> Q Highway 51(From Old Hwy.10/Snelling to just past Glenhill Rd) 1,373 0.26 <br /> R County Road E-(From Lexington Trail to existing Concrete Sidewalk&Connelly Ave) 2,050 0.1 <br /> Total Proposed Future Trails 94.280 17.6 <br /> The above list is not a ranked priority list of proposed path expansions and <br /> upgrades. The City has identified certain trail segments that are crucial for <br /> developing needed north-south and east-west path connections that are divided <br /> by major highways: G, G1, H, I, 11, 12, and 13. In coordination with the capital <br /> improvements plan (CIP), the City may benefit from setting specific trail priorities <br /> to take advantage of grants, road reconstruction projects, and other opportunities <br /> as they arise. <br /> Approved: September 28, 2009 <br /> 9-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.