My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
05-09-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:16:40 AM
Creation date
5/8/2012 8:37:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the south side of the campus. At this time Bethel is proposing to construct the fitness center, <br /> but in a different location than was previously anticipated, and with a broader array of <br /> services and amenities related to the overall wellness of the students. Because the location <br /> and size of the project are being adjusted from what was included in the 1996 Master Plan, a <br /> CUP Amendment is necessary. Furthermore, the maximum height allowed for buildings in <br /> the B-1 District is 35 feet. A variance is needed to allow the building to be constructed at a <br /> height of 39 feet, six inches. <br /> As part of the application, Bethel University is also proposing adjustments to the timing and <br /> location of the temporary classrooms that are located in the general area of the proposed <br /> wellness center. Two of the four classrooms are proposed to be relocated to the parking area <br /> on the north side of the Community Life Center, while the other two would remain in their <br /> current configuration. Upon completion of Phase II all four temporary classrooms would be <br /> removed. <br /> The applicant has submitted an application,project description, narrative, a site plan, <br /> elevations,and site survey (Attachments B and E). <br /> 2. Surrounding Area: <br /> uu y <br /> cE►Qn ,� 't1Se,� _ �� `ding <br /> North Right-of-Way/Low Density Residential Right-of-Way/R-1 Single Family Right-of-Way/Single Family <br /> Residential Residential <br /> South Railroad/Low Density Residential Railroad/R-1 Single Family Railroad/Single Family Residential <br /> Residential <br /> East Right-of-Way/Industrial Right-of-Way/I-Flex Right-of-Way/Office/Industrial <br /> West Low Density Residential R-1:Single Family Residential Single Family Residential <br /> 3. Site Data: <br /> a " Public and Institutional <br /> o - <br /> Institutional <br /> B-1:Limited Business District <br /> —246 acres including Ona Orth and Lake Valentine,—187 acres not including Lake Valentine <br /> The elevation generally decreases toward the southwest. 7-71 <br /> Phasing <br /> Bethel University is proposing this project over two phases (Attachment B): <br /> • Phase I— Summer 2013 <br /> o Relocated two of the four temporary classrooms to the parking lot north of the <br /> Community Life Commons to be used until construction of Phase II is complete. <br /> City of Arden Hills <br /> Planning Commission Meeting for May 9, 2012 <br /> P:Wlanning0anning Cases12012112-006-Bethel University-CUP Amendment(Pending)105-09-15-PC Report-Bethel CUP Amendment.doc <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.