My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-12 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2012
>
05-15-12 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:08:18 AM
Creation date
5/10/2012 3:04:16 PM
Metadata
Fields
Template:
General
Document
5-15-12 PTRC Packet
General - Type
5-15-12 PTRC Packet
Category
5-15-12 PTRC Packet
Date
5/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2013 thru 2017 <br /> City of Arden Hills, Minnesota <br /> Project# 14-Park-008 <br /> Project Name Snelling Avenue Regional Trail <br /> Type Improvement Department Parks Department <br /> Useful Life Contact Park&Recreation Mgr <br /> Category Park Capital Improvements Priority n/a <br /> Description Total Project Cost: $1,500,000 <br /> Completion of Snelling Regional Trail-Segment I3 from County Road E2 to Highway 96. <br /> Completing segments I1 and I2 from County Road E to County Road E2 is estimated to cost$975,000. This is itemized on its own due to the <br /> City applying for Legacy Funding. To complete the rest of the I segment 3,from County Road E2 to Highway 96(going with the west side),it <br /> could be an additional$1.5 million dollars. The City could potentially seek federal funding assistance for this corridor. <br /> Segment I: (51 to Cty Road E) -Identified in project 12-str-007 <br /> Segment I1 and I2: (Cty Rd E to Cty Rd E2)$975,000-Legacy Funding Application-Not included with this improvement as it was applied <br /> for on its own. <br /> Se ent 13: (Cty Rd E2 to Highway 96)$1,500,000 <br /> Justification <br /> The PTRC has identified this trail in it's 2006 Strategies as a priority. It is identified as a key north-south regional connection. The Snelling <br /> Avenue PMP reconstruction has currently no set date for reconstruction. That project may factor into when that portion of trail is constructed. <br /> Staff needs to continue to research the various funding possibilities. <br /> Expenditures 2013 2014 2015 2016 2017 Total Future <br /> Planning/Design 265,000 265,000 F 1,235,000 <br /> Total 265,000 265,000 Total <br /> Future <br /> 1,500,000 <br /> Total. <br /> Budget Impact/Other <br /> Segment 13 from County Road E 2 to Highway 96 is 8,870 feet x$2.00 a linear foot=$17,740 (16,579 linear feet times$2 a foot for the entire <br /> corridor=$33,158. <br /> Produced Using the Plan-It Capital Planning Softivare Thursday,April 12,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.