Laserfiche WebLink
Section 1325— General Regulations <br /> A. Height—Meets Requirements <br /> In all zoning districts which are not residential,the Code requires that accessory <br /> structures not exceed the height of the principal structure to which they are accessory. <br /> The proposed garage would not exceed 15 feet in height, which is far lower than the <br /> principal structure on the lot. <br /> B. Size—Meets Requirements <br /> The Zoning Code requires that accessory structures in zoning district other than <br /> residential be limited in size by the lot coverage standards for the parcel. This <br /> requirement is met by the proposed plans. <br /> C. Exterior Finish—Meets Requirements <br /> The Code requires the exterior finish of accessory structures to be compatible in <br /> appearance and materials used with the principal structure served by the accessory <br /> structure. The proposed garage would be constructed of brick and EIFS in a color and, <br /> texture that match the building materials of the existing principal structure. <br /> D. Landscaping and Tree Preservation—Meets Requirements <br /> Five significant trees would be removed as a result of this application. The Code allows <br /> up to ten percent of the existing significant caliper inches on site to be removed without <br /> mitigation. The proposed amount to be removed is far below this threshold. Based on <br /> the size of the addition, additional landscaping is not required. <br /> E. Lighting—Meets Requirements <br /> No additional lighting is proposed as part of this project. <br /> F. Parking,Loading, and Circulation-Meets Requirements <br /> No parking stalls would be lost as a result of this application. <br /> 2. Additional Review <br /> The City Public Works Director and Building Inspector have reviewed the project and have <br /> not expressed any objections to the proposal. Building permits will be required and all <br /> building and fire code requirements will be met. <br /> City of Arden Hills <br /> Planning Commission Meeting for June 6, 2012 <br /> P:IPlanningWlanning Cases12012U2-010-4293 Lexington-Site Plan Review106-06-12-PC Report-CSMSite Plan Review.doc <br /> Page 3 of 5 <br />