My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9B, Assistant City Engineer Appointment
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
02-13-12-R
>
9B, Assistant City Engineer Appointment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:14:47 AM
Creation date
6/21/2012 3:14:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lohn M. Anderson (page 2) <br />• Manage the City's erosion and sediment control inspection program <br />• Update City code to comply with MS4 NPDES permit requirements <br />• Review private development plans for compliance with City standards <br />City of Hopkins Hopkins, MN 2002-2004 <br />Assistant City Engineer <br />• Manage coordination of consultant design services related to engineering projects <br />• Prepare various written documents including memos, counci� reports, cost estimates <br />• Manage department budget including recommendations for future year budget cycles <br />• Review of private developments <br />• Supervise two Engineering Technicians work <br />• Assist in formulating Capital Improvement Budget <br />• Oversee design, construction, and assessments for City public works projects <br />• Issue Utility and driveway permits <br />• Permit writing and compliance with NPDES MS4 permit <br />Howard R. Green Company St. Paul, MN 1998 — 2002 & 2004 - 2005 <br />Project Engineer <br />• City Engineer, City of Afton MN - plan review of private developments from concept plan through <br />construction, development of capital improvement plan, preparation of plans and specification for <br />public infrastructure improvements, coordination with road maintenance supervisor of major road <br />work, assistance in obtaining funding <br />• Drainage design, Pond Routing, and Construction Plan review of numerous private developments in the <br />City of Elk River <br />• Project Engineer for 2.0 million dollars of Street reconstruction in Falcon Heights, MN, Major duties <br />included public involvement, plan preparation, bidding and construction management. <br />• Project Design for drainage improvements associated with construction of 2.0 miles of new state aid <br />collector street with over 1,400 acres of drainage area in Elk River, MN <br />Education <br />University of Wisconsin — Milwaukee, BS - Civil Engineering <br />Certification <br />PE in Minnesota —1998 PE Wisconsin -1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.