Laserfiche WebLink
ATBcT Telecom Upgrades <br />May 2, 2012 . <br />�age 2 <br />6. �'erform site visits to ensure that the installation is in accordance with the City's requirements: <br />• Provide inspection of the applicable coating surface pre�aration and applicatioa to ensure <br />compliance with the existing system and manufacturers recommendations (Includes up to 2 trips <br />to shop painting facility or field, specitic to inspection of painted components/penetrations) <br />• Provide inspection of installed welded/attached components in accordance with the approved plans, <br />to be scheduled in cooperation with the contractor, and prepare a fmal punchlist (2 site visits) <br />7. Rcview record drawings of the insta.11ation prepared by the contractor and prepare closeout <br />documentation for distribution to the City <br />Schedule <br />Upon your authorization we can begin this project immediately. Specific to the AT&T Upgrade, plan <br />reviews, calculations reviews and shop drawing reviews will be completed within seven (7) business days <br />after receipt. Construction observation of major work items will be performed based onthe agreed upon <br />schedule (determined at the preconstruction meeting, with the contractor providing 48 hours notice). <br />Compensation <br />SEH proposes to provide services related to the Master Lease Agreement as aLump Sum. Services <br />related to the AT&T Upgrade as referenced above are on an hourly basis plus reimbursable expenses <br />including (reproductions, mileage, and daily vehicle allowance). SEH estimates the following fee: <br />Master Lease AgKeement $3,350.00� <br />AT&T LTL Upgrade $4,650.00 <br />Total $8,000.00 <br />Should circumstan.ces arise that require additional effort on the part of SEH staff, we will request <br />authorization from the City to perform these services, and provide and a.n estimate of any additional fees. <br />SBH will prepare monthly invoices that itemize costs (fees and expenses) for work performed during the <br />billing period. Interest in the amount of 1%0 of the unpaid balance per month may be added to the unpaid <br />balance of invoices that are not paid within 3S days:of receipt. <br />This Letter A�reement shall be the basis of work by SEH on the project described in this letter. If you are <br />in agreement with the terms, please execute both copies of this Letter Agreement with proper signatures <br />and return one copy to our office in the enclosed envelope. <br />Respectfully, <br />SHORT ELLIOTT HENDRICKSON INC. <br />. � <br />. . . M . � - . � � � . <br />Daniel J. Zienty <br />AssociateJ Senior Project Design Leader <br />amc <br />� � o:leelp�erdenlcommonV 198911at&t taiccom upgrados propoael toj.hutmechar 3112.Jocx � � � � . � � <br />Accepted this day of 2012 <br />City of Arden Hills, Minnesota <br />By: <br />Title: <br />