My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Approval of Arden Hills Gateway Sign
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
07-30-12-R
>
8A, Approval of Arden Hills Gateway Sign
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:25:03 AM
Creation date
7/30/2012 9:31:16 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=-:� <br />� e F .. � �' 4�'C.! <br />de � �' �� <br />�t`' �'� � �:a���� <br />�.� ry ' F�. � Wi7I�� � �'�F Aays'e �i1P�� <br />�I�1. ���3a�PG3i:..�l/�4? � A/F� ���+�V3e�9�� <br />Ta: Meagan Beekman <br />City Planner <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />rrom: Jay Higgins <br />Fourth Dimension Signs <br />1209 County Road E, West <br />Suite 100 <br />Arden Hills, MN 55112 <br />Hi Meagan, <br />Below you will find the official quote for the Arden Hills monument sign that is to be located in the <br />southwest corner of the intersection of Lexington Ave. and County Road E. <br />Qty 1: 72" tall x 120" length x 12" deep, single face monument sign. Illumination to be external LED <br />flood lighting. All aluminum composite sub strusture and frame material. Main brick/stone section of sign to be <br />maintennace free high-density paly�urathane (HDPE) "FAUX PANELS". City logo to be 1/4" anodized or <br />painted plate aluminum mechanically fastened to face. Top wave accent to be fabricated aluminum and painted. <br />Reveal and pole cover (lower section) to be aluminuxn fabricated and painted. Two pole direct burial installation <br />method. One exterior grade LED flood light provided. Drawing 4/2. <br />Total for sign and installation: $10,100.00 plus any applicable state and local tax. <br />Estimate is based upon normal soil conditions and free of any subsurface obstructions. Final electrical <br />hookup and burial of exterior gr�de conduit not included in this price due to unknown specific location and <br />pending Gopher One site inspection. Installation permits, if applicable, are not included in price and are <br />additional if r�quired. <br />Estimated completion date is 6 to 8 weeks upon isst�ance of purchase order and down payment as well as <br />issuance of installation permits if required. Payment terms are 50% down and net 30 days on totaled balance. <br />SIGNATURE OF AUTHORIZING AGENT <br />Date: <br />1209 West County Road E Suite 100 Arden I-Iills, MN 55112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.