My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B, Order Feasibility Study for 2013 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
08-13-12-R
>
8B, Order Feasibility Study for 2013 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2012 11:43:28 AM
Creation date
8/9/2012 11:43:25 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lt <br /> EN HILLS <br /> MEMORANDUM <br /> DATE: August 13,2012 <br /> TO: Honorable Mayor and City Councilmembers <br /> Patrick Klaers, City Administrator <br /> FROM: Terry Maurer, Public Works Director `(1� <br /> SUBJECT: Order Feasibility Study for 2013 PMP \ 'd <br /> Background <br /> The 2012 thru 2016 Capital Improvement Plan (CIP) contains an item for the 2013 PMP <br /> in the amount of$1,534,000 (a copy of the CIP detail sheet for this item is attached). The <br /> area of the 2013 PMP is shown on the attached exhibit. The streets included in this area <br /> are Edgewater Avenue, Glenhill Road, Asbury Avenue and Ridgewood Road. Planning <br /> and design for this project was anticipated to begin in 2012 and $55,000 of the total CIP <br /> budget is shown to be used in 2012 for planning/design. <br /> Discussion <br /> As with previous PMP's the Feasibility Report will include a geotechnical investigation, <br /> topographic survey of the area, an analysis of the existing sewer and water systems, <br /> preliminary design of the street improvement, cost estimate and proposed assessment. <br /> With the addition of the Assistant City Engineer position, the Feasibility Report will be <br /> completed by staff with the exceptions of the geotechnical investigation and the <br /> topographic survey. <br /> As part of the Feasibility Report a neighborhood informational meeting will be held at <br /> City Hall. At that meeting an overview of the potential project, timing and estimated cost <br /> and assessment will be presented. Given the recent discussion with the City Council <br /> regarding the reconstruction of city streets, with or without concrete curb and gutter; both <br /> options will be presented along with cost and assessment ramifications to solicit input to <br /> be used by the City Council in making the final decision regarding the design of the <br /> street. Information from the informational meeting, including minutes, will be made part <br /> of the Feasibility Report. <br /> City Council Meeting <br /> P:\Admin\Council\Agendas&Packet Information\2012\08-13-12 Reg Mtg\Packet\2013PMPOrderFeaibilityStudy.doc <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.